Supporting Documentation · Nov 12, 2025
256-25 Proposal FPA - West Orange - MS4 Compliance.pdf
422bd5688af9cf4b5c2a6826ff36574b7aaa3c2fa54d8751c9e07dc4e5a45f17Indexed text · page 45
Show all pagesMatthew G. Voelkel, PE Project Manager, Water & Wastewater Three Brooks Road Water Main Replacement Freehold Township, New Jersey Project Manager for the design of 5,600 linear feet of 10-inch diameter water main along Three Brooks Road in Freehold Township. The design included three horizontal directional drills at three Monmouth County Bridge Crossings. Rutgers Village Phase VII Water Main Replacement City of New Brunswick, New Jersey Project Manager for the design, bid, and construction phase services for the replacement of 2,000 linear feet of 8-inch and 12-inch diameter water main along South Pennington Road in the City of New Brunswick. Raceway Mall Tank Rehabilitation Freehold Township, New Jersey Project Manager for the design, bid, and construction of the rehabilitation of the 3.0 million gallon water storage standpipe at the Raceway Mall in Freehold Township. Koenig Lane Water Treatment Plant Filter Upgrades Freehold Township, New Jersey Project Manager for the design and construction of ion exchange pressure filter upgrades and filter media replacement for vertical pressure filters at the Freehold Township Water Treatment Plant. Harmony Street Sanitary and Storm Sewer Improvements North Plainfield Borough, New Jersey Construction Administrator for the construction of a replacement sanitary sewer. The work included 300 lf of 8-inch diameter sewer main, sanitary manholes, sanitary sewer laterals, stormwater catch basins, stormwater manholes, and stormwater piping. Responsibilities included coordination with general contractor, Borough Department of Public Works, Borough Engineer, and Borough Police Department. Route 22 and North Drive Sanitary Sewer Improvements North Plainfield Borough, New Jersey Assisted with the design for the construction of replacement sanitary sewer along a state highway. The work included the replacement of 300 lf of 8-inch diameter sewer main, sanitary manholes, and sanitary sewer laterals. The design work included preparing construction drawings and specifications, and developing traffic control plans for single lane and shoulder closing on State Highway Route 22 in accordance with NJDOT regulations. Additional responsibilities included coordination with NJDOT engineers for utility opening permits, and production of construction drawings and specifications. Lakewood Township Municipal Utilities Authority, Mercury
sibilities included coordination with NJDOT engineers for utility opening permits, and production of construction drawings and specifications. Lakewood Township Municipal Utilities Authority, Mercury Removal Treatment GAC Media Replacement Lakewood, New Jersey Project Engineer for the design, bid, and construction phases for the Mercury Removal Treatment GAC Media Replacement project. Water Street Distribution System Improvement Charges (DSIC) Water Main Replacement, SUEZ Toms River, New Jersey Project Manager for the design of approximately 5,000 lf of water main replacement. The project involved surveying, Page 2
File revisions (1)
- Sep 29, 2026
422bd5688af914,010,803 bytes