Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 24, 2025

271-25 Exhibit A-Matrix RSGC Proposal.pdf

Preserved file SHA-256d7f07c8c55e8d52f16c9dfec963f4e65562e4ea75bc51215d73022fd4dfcbe9e

Indexed text · page 4

Show all pages
Page 4

PROJECT COST AND SCHEDULE The total cost (Time and materials not to exceed) to conduct the above environmental services for the Site is $49,800.00. Task 1 – LSRP Retention Labor .............................................................................................................................$ 3,340.00 Task 1 Estimated Costs .$ 3,340.00 Task 2 – Confirmatory Groundwater Sampling Event Labor .............................................................................................................................$ 2,610.00 Direct Expenses (lab/equipment/Travel).........................................................................$ 1,600.00 Task 2 Estimated Costs .$ 4,210.00 Task 3 – Update and Submission of the Site Investigation Report to NJDEP Labor .............................................................................................................................$ 8,210.00 Task 3 Estimated Costs .$ 8,210.00 Task 4A – Termination of Groundwater Remedial Action Permit Labor .............................................................................................................................$ 7,810.00 Direct Expenses (NJDEP Fee) .......................................................................................$ 1,420.00 Task 4A Estimated Costs$ 9,230.00 Task 4B – Biennial Certification of Groundwater Remedial Action Permit Labor .............................................................................................................................$ 7,810.00 Direct Expenses (NJDEP Fee) .......................................................................................$ 1,420.00 Task 4B Estimated Costs$ 9,230.00 Task 5 – Well Decommissioning Labor .............................................................................................................................$ 3,010.00 Direct Expenses (Driller/Travel) .....................................................................................$ 7,020.00 Task 5 Estimated Costs .$ 10,030.00 Task 6 – Issuance of Remedial Action Outcomes Labor .............................................................................................................................$ 9,320.00 Task 6 Estimated Costs .$ 9,320.00 Task 7 – LSRP Oversight and Project Management Labor

Page 4

......................................................................................................$ 9,320.00 Task 6 Estimated Costs .$ 9,320.00 Task 7 – LSRP Oversight and Project Management Labor .............................................................................................................................$ 5,460.00 Task 7 Estimated Costs .$ 5,460.00 TOTAL ESTIMATED COSTS ...........................$49,800.00 All proposed costs are based on Matrix’s current 2025 labor rates; however, any work performed on or after January 1, 2026, will be billed at Matrix’s 2026 rates. As outlined in the scope of work, either Task 4A or Task 4B will be implemented—depending on the results of the groundwater sampling event—and this is reflected in the total project cost. Additionally, Tasks 5 and 6 will only be performed if the conditions described in the scope are met and their implementation becomes appropriate. These Environme ntal Services will be completed in accordance with Matrix’s Terms and Conditions (Attachment 1). Matrix is prepared to begin work immediately upon receipt of a notice to proceed. The return of a signed copy of F:\2025\25-0698- Rock Spring Golf Course\Proposal\Rock Spring Country Club Proposal_Final_11.13.2025.docx 4

File revisions (1)