Page 53

0,000 orn score lar appuEs Pet GENERALAGGREGATE _| $3,000,000 ¥ | pouicy [lv ao; | Loc PRODUCTS - COMP/OP AGG | $3,000,000 | OTHER: 8 A _| AUTOMOBILE LIABILITY AHY-7924529-21 1273172024 | 12/31/2025 | GOMEMETSNGLETIMIT TS 000,000 v | ANvauto BODILY INJURY (Per person) | $ a [| OWNED SCHEDULED BODILY INJURY (Per accidend)| § NON-OWNED PROPERTY DAMAGE 7 |__| AUTOS onty AUTOS ONLY |{Gerecdden) $ B [7 | uwrencauas [7] occur TUU 0249172-15 12/31/2024 | 12/31/2025 | cacn ocCURRENCE $4,000,000 EXCESS LIAB CLAIMS-MADE| AGGREGATE $4,000,000 veo | ¥ [perennons 10,000 s T_|WORKERS COMPENSATION [202401-04-74-06-5Y Tast2024 | 273172025 | v [eure |_| SR [AND EMPLOYERS’ LIABILITY vIn en ANYPROPRIETORIPARTNER/EXECUTIVE ELL. EACH ACCIDENT $1,000,000 |OFFICER/MEMBEREXCLUDED? NIA i (Mandatory in NH) ELL DISEASE - EA EMPLOYEE] § 4,000,000 if yea, describe under DESCRIPTION OF OPERATIONS below ELL DISEASE - POLICY LIMIT | 1,000,000 D_ Professional Liability IMCH591908602 72/31/2024 | 12/31/2025 | $2,000,000 Per Claim $2,000,000 Aggregate DESCRIPTION OF OPERATIONS ! LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Evidence of Insurance CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE SAMPLE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ‘AUTHORIZED REPRESENTATIVE Lm Fok Toe ! RSC Insurance Brokerage © 1988-2015 ACORD CORPORATION. All rights reserved, ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD Sggacoze | 217876 | 24-25 cu, aura, Unb, | angela Fasolas | 2/4/2025 11:05:05 aM (EST) | Page 1 of 2 this certirioate cancels’ and Supersedes ALL previously lasued certificates.

Page 54

BOSWELL SSS] ES 330 PHILLIPS AVENUE SOUTH HACKENSACK, NEW JERSEY P. 201-641-0770 IS1EeTE

Page 55

Proposal for Luddington Road Sidewalk Panel Replacement December 5, 2025 Submitted to: TOWNSHIP OF WEST ORANGE DEPARTMENT OF ENGINEERING

Page 56

Luddington Road Sidewalk Panel Replacement Table of Contents Cover Letter SECTION 1 Project Understanding SECTION 2 Scope of Work SECTION 3 Similar Project Experience SECTION 4 Fee Proposal and Hourly Rates SECTION 5 Project Schedule SECTION 6 Sample Insurance Certificate

Page 57

Engineering | Surveying | Planning | Construction Inspection December 5, 2025 Zayibeth Carballo, PE, PLS, PP, CME, CFM, CFS Director, Municipal Engineer Township of West Orange 25 Lakeside Avenue West Orange, NJ 07052 RE: Response to Request for Proposals for Professional Services for Luddington Road – Sidewalk Panel Replacement Township of West Orange, Essex County, New Jersey Dear Ms. Carballo: Thank you for the opportunity to respond to the Township’s Request for Proposal for Professional Services for the above- referenced project. We have visited the site and believe we understand the Township’s goals and objectives for this project. Our December 3, 2024 Qualifications Statement submitted to the Township demonstrates that our experienced staff have the expertise necessary to accomplish the project. We are pleased to have this opportunity to be of continued service to the Township of West Orange and hope you will find our proposal favorable. We would be happy to provide additional information or assistance as needed. Should you have any questions, my direct line is (973) 434-8306. Respectfully Submitted, GREENMAN-PEDERSEN, INC. Thomas Aslanian, PE Structural Engineer TJA/pd Enclosure cc: Andrew Cangiano, PE, CME Patty DiGiorgio m:\proposal\tja\west orange\2025 luddington road\proposal_luddinton road sidewalk 12-5-2025.docx 301 Gibraltar Drive, Suite 2A Morris Plains, NJ 07950 973.377.8500 Over 60 offices throughout the United States www.gpinet.com An Equal Opportunity Employer

Page 58

Luddington Road Sidewalk Panel Replacement Project Understanding From our review of the RFP and a site visit, it is understood that the project scope includes the engineering design for the replacement of the drainage culvert top slab panels acting as a sidewalk along the north side of Luddington Road, which will include the following: 1. Survey of the project site and preparation of base mapping. 2. Structural design of the replacement culvert top slab. 3. Preparation of contract drawings and specifications. 4. Preparation of detour plans. 5. Up to four (4) meetings with the Township. 6. Preparation of a Bid Package in accordance with public bidding laws. 7. Providing Construction Administration services, including review of submittals and shop drawings, and part-time construction inspection. The existing drainage culvert and sidewalk panels were originally constructed in the 1930s as part of the Luddington Road Outlet Tunnel, which provides a sewer connection between the First and Second Mountains within West Orange Township. From a review of the construction plans provided by the Township, the drainage culvert within the project area is a ramp portal that provides access to the eastern entrance of the Luddington Road tunnel. As such, the existing concrete sidewalk slabs were constructed as movable slabs that could be removed to access the ramp into the tunnel. Coordination with the Township will be required to determine the need to maintain access to the tunnel ramp. The ramp portal consists of a cast-in-place concrete culvert varying in height from 6” to 8’-11 ½” with a clear span of 6’-0”. The sidewalls have a minimum width of 1’-0” with steel angle top slab seats supporting a 5” thick concrete top slab. The original top slab detail provided on the As-Built plans included two (2) lifting rings on each slab. However, based on our site visit, it appears the original sidewalk slabs have been replaced since the original construction, as no rings or evidence of grouting are currently present. It is anticipated that an in- depth evaluation of the condition of the culvert sidewalls, top slab seats, and bottom slab is not included in the scope of this project; however, standard substructure repair details can be provided as an if and where quantity on the construction drawings. Per the RFP, GPI will coordinate and attend

Page 58

cluded in the scope of this project; however, standard substructure repair details can be provided as an if and where quantity on the construction drawings. Per the RFP, GPI will coordinate and attend an on-site Preliminary Design meeting with Township representatives following completion of the survey base mapping to discuss the project scope. This meeting will be followed by the preparation of the preliminary slab design and construction drawings. Construction drawings will include demolition plans, framing plans, concrete slab details, and, if and where directed, substructure repair details. During the Preliminary Design phase, GPI will also coordinate and attend a meeting with the Township’s WOPD Traffic Bureau to discuss traffic control and detour plans. A Preliminary Design package will be submitted to the Township, which will include construction drawings, detour plans, specifications, and a preliminary cost estimate for review. Following the Township review, a Final Design Meeting will be held to discuss the Township’s comments and final edits to be incorporated into the final contract documents. GPI will prepare the final contract documents, including final plans, specifications, and the engineer’s estimate for submission to the Township for approval. Upon approval of the Final Contract Documents, GPI will prepare the Bid Package, including construction plans and technical specifications suitable for public bidding. Deliverables for this project consist of twenty (20) copies each of the Bid Package (construction plans, engineer’s estimate and specifications). GPI will also provide digital copies (AutoCadd and Adobe formats) of the contract documents. Following bidding, GPI will also provide Construction Administration Services to assist the Township throughout the construction phase. GPI will review bid results and prepare a bid recommendation summary for Township review, coordinate and attend a pre-construction meeting, and review submittals and shop drawings for conformance with the Contract Documents. During construction, we will provide part-time construction inspection services at major project milestones, including the installation of detour signage, demolition of the culvert top slab, and installation of replacement panels.

Page 58

ge, demolition of the culvert top slab, and installation of replacement panels. Page | 1

Page 59

Luddington Road Sidewalk Panel Replacement Scope of Work The Request for Proposals (RFP) sets forth the required work to be performed. We have reviewed the RFP, visited the site, and we believe we have a clear understanding of the goals of this project. This proposal is intended to be fully responsive to the RFP. The following tasks include our approach to completing the project. The Scope of work will consist of the following tasks: 1. Surveying Services Field surveying and base mapping will be performed to detail all planimetric features and right-of-way information pertinent to the preparation of the construction plans for the sidewalk panel replacement. All survey work will be done in accordance with West Orange and NJDOT standards. A. Topographic Survey GPI will conduct a survey of existing features, including existing roadway elements, drainage structures, fences, signs, trees, shrubs, walls, driveways, sidewalks, steps, service walks, grade elevations, and utilities, from visible above-ground observation. Station and offset from the centerline to existing drainage structures will be shown on the plan. The type of structure, type of casting, size, and types of pipes entering the structure and inverts on all pipes will be recovered by field survey. The survey limits will extend a sufficient distance for design purposes. The limits of detailed planimetric and topographic coverage will extend along Luddington Road for 100’ east and west of the sidewalk replacement limits and 50' from the roadway centerline on each side. Contours will be shown at 1' intervals. Individual trees and specimen shrubs will be located within the immediate vicinity of the project area. B. Establish Roadway Right-of-Way Existing roadway right-of-way and property lines will be determined through research of deeds and maps, as well as field surveys of existing evidence. Front property corners will be located along the roadway extending 100’ east and 100’ west of the sidewalk limits. C. Establish Horizontal Control We will establish control points as necessary to reference the project baseline. Horizontal control will be tied to the New Jersey Plane Coordinate System (NJSPC) NAD 83.

Page 59

Control We will establish control points as necessary to reference the project baseline. Horizontal control will be tied to the New Jersey Plane Coordinate System (NJSPC) NAD 83. Vertical control will be tied to the North American Vertical Datum (NAVD 1988). D. Benchmarks Three (3) benchmarks will be established at a minimum on each side of the sidewalk for the Contractor's reference during construction. E. Existing Conditions/Survey Control Plan We will prepare an Existing Conditions and Survey Control Plan detailing all planimetric features and right-of-way at the project site for Township review. All comments received following the review will be incorporated, and a final, signed, and sealed Existing Conditions and Survey Control Point Plan will be submitted to the Township. Base mapping CADD files will be provided to the Township following completion of the contract documents. F. Utilities GPI will prepare preliminary utility base mapping and submit utility coordination requests to all utility companies with facilities in West Orange Township. All information shown on the plans for underground utilities will be as provided by the utility Page | 2