Show all pagesGregory Avenue and Lowell Avenue Safe Routes to School Preliminary Engineering, Final Design, and Construction Engineering Services Page 17 Preliminary Engineering – Scope of Work impacts are not anticipated. There are no additional permits anticipated. No mitigation is anticipated. If the anticipated permits or fees change upon agency consultation, a supplement may be required. b. Complete Environmental Plans (4585) In coordination with NJDOT, STV will collect and assemble supporting information, engineering analysis and environmental reports. STV will prepare and complete the environmental plans showing environmental and regulated resources, soil erosion and sediment control plans, permit tracking information, and required notes. 11. Landscape a. Complete Landscape Architectural Design (4265) If stormwater management basins are needed, landscaping will be required. STV will prepare a final landscape architectural plan. STV will prepare specifications and details and calculate final quantities and costs of all items. 12. REPORTS AND SUBMISSIONS a. Prepare Soil Erosion and Sediment Control Report , Plans and Specifications (4410) STV will prepare and submit the Soil Erosion and Sediment Control (SESC) Plans, report, application, and supportive documents as necessary for Soil Conservation District certification. The plans will include any and all measures, details and notes as required. STV will prepare the SESC Plans based on engineering/design, local need, and district requirements, incorporating the controls and features identified in the SESC standards, SESC plans, report and supportive documentation as necessary. STV will submit the SESC Report and Plans as necessary to the County Soil Conservation District for their review and approval. This scope includes any and all plan, report, application and supportive document revisions needed for SCD certification. b. Prepare Final Design Submission Package (4290) STV will prepare the Final Design (FD) Submission package according to the NJDOT Quality Management
ication. b. Prepare Final Design Submission Package (4290) STV will prepare the Final Design (FD) Submission package according to the NJDOT Quality Management Guidelines. The package should include: • Specifications • Buy America provisions • Transmittal letter indicating the distribution of all FD Submission deliverables • Designer FD Submission Certification • Final Plans (prints only) with copies to the appropriate review units. • Special Provisions • Construction Cost Estimate • Construction Schedule c. Resolve Final Design Submission Comments (4830) STV will address and resolve all comments provided by the RC and team as a part of the review process. Once all comments are resolved, the RC and team will inform STV that the project can proceed to PS&E. d. Submit PS&E Package (4840) Following the resolution of all comments made by NJDOT on the Final Design Submission, STV will make the final revisions to the plans, specifications and estimates. STV will submit the PS&E package, which
File revisions (1)
- Sep 29, 2026
ce3dc33c6f7d2,051,122 bytes