Supporting Documentation · Apr 28, 2026
129-26 (Exhibit A) STV-consultant-ageement_2026-01-05.pdf
ce3dc33c6f7d7241bcc0d9482fc70d2af2d8fb3d09f3e8b98b1345a9e5414c8dIndexed text · page 35
Show all pagesSafe Routes to School West Orange Township Cost Summary Table PRELIMINARY ENGINEERING - TOTAL Salary $ 96,591.96 Overhead (141.48%) $ 136,658.31 Fixed Fee (19.5% of direct labor) $ 18,835.43 PRELIMINARY ENGINEERING - SUBTOTAL Direct Labor $ 252,085.70 Preliminary Engineering - Direct Expenses Geotechnical Drilling (including test pits & infiltration testing) $ 19,000.00 Geotechnical Laboratory Testing $ 2,000.00 Travel (by personal auto) $ 250.00 Reproductions & Printing $ 500.00 Other $ 200.00 Postage $ 200.00 Preliminary Engineering - Direct Expense Total $ 22,150.00 SUB-CONSULTANTS AmerCom Corporation $ 112,811.89 Preliminary Engineering - Subconsultants Total $ 112,811.89 PRELIMINARY ENGINEERING TOTAL $ 387,047.59 FINAL DESIGN - TOTAL Salary $ 91,968.18 Escalation (@ 3%) $ 2,759.05 Overhead (141.48%) $ 134,020.08 Fixed Fee (19.5% of direct labor) $ 18,471.81 FINAL DESIGN - SUBTOTAL DIRECT LABOR $ 247,219.12 Final Design - Direct Expenses Travel (by personal auto) $ 250.00 Reproductions & Printing $ 500.00 Other $ 200.00 Postage $ 200.00 TOTAL Direct Expenses $ 1,150.00 FINAL DESIGN TOTAL $ 248,369.12
File revisions (1)
- Sep 29, 2026
ce3dc33c6f7d2,051,122 bytes