ACTIVITY ENGINEE PLANNE ASSOC. DRAFT. TOTAL TOTAL MNGR. (P-VII). ENGR. ENGR. ENGR. PROJ. PLAN. (ET-V) (P-IV) (P-IV) (P-III) (P-V) SEN. SEN. SEN. (P-II) PRJ. (P-I) I.D. R R TASK DESCRIPTION HRS. HRS. HRS.

Page 39

R R TASK DESCRIPTION HRS. HRS. HRS. HRS. HRS. HRS. HRS. HRS. Hours Cost PRELIMINARY ENGINEERING- SUBTOTAL SUBTOTAL 32 258 400 444 24 52 308 1,518 $ 96,591.96 FINAL DESIGN GENERAL TASKS SUBTOTAL 28 104 44 18 32 8 234 $ 18,417.82 1 Project Management 8 32 40 $ 3,543.76 4795 2 Execute FD Public Involvement Action Plan $ - 2a Coordination Meetings 2 8 16 4 8 38 $ 2,779.02 2b Stakeholder Meetings 2 8 16 8 16 50 $ 3,549.70 2d Hold Public Information Center $ - In-Person PIC 4 4 4 4 4 20 $ 1,553.48 Plan Displays 4 8 8 20 $ 1,290.88 Update Project Website 2 4 2 4 12 $ 914.08 3 Quality Assurance & Quality Control 8 40 48 $ 4,258.16 4010 4 Initiate Final Design 2 4 6 $ 528.74 1 GEOMETRICS AND ROADWAY SUBTOTAL 12 40 64 64 180 $ 10,257.12 4210 a Complete Horizontal and Vertical Geometry 4 16 32 32

Page 39

12 40 64 64 180 $ 10,257.12 4210 a Complete Horizontal and Vertical Geometry 4 16 32 32 84 $ 4,669.36 4220 b Prepare Final Roadway Plans 8 24 32 32 96 $ 5,587.76 2 TRAFFIC SUBTOTAL 4 8 16 16 44 $ 2,513.28 Complete Flashing Pedestrian Beacon, Signing 4 8 16 16 44 $ 2,513.28 a and Striping Plans 4240 3 DRAINAGE/ H&H/ SWM SUBTOTAL 4 8 16 28 $ 1,768.32 4270 a Complete Drainage / H&H/ SWM Design 4 8 16 28 $ 1,768.32 4 STRUCTURES SUBTOTAL 4 8 24 24 60 $ 3,310.72 4160 a Prepare Final Structures Documents 4 8 24 24 60 $ 3,310.72 5 GEOTECHNICAL ENGINEERING SUBTOTAL 6 46 80 108 240 $ 13,081.86 4300 a Develop Subsurface Exploration Program 2 6 12 20 $ 1,344.78 4305 b Gather Subsurface Information 2 5 20 40 67 $ 3,239.64 Conduct Geotechnical Foundation, Roadway, and 2 24 24 32 82 $ 4,836.98 c 4320 Rock Slope Design