Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 28, 2026

129-26 (Exhibit A) STV-consultant-ageement_2026-01-05.pdf

Preserved file SHA-256ce3dc33c6f7d7241bcc0d9482fc70d2af2d8fb3d09f3e8b98b1345a9e5414c8d

Indexed text · page 47

Show all pages
Page 47

merCom Corp. Consulting Engineers Responsive Cost-Effective Solutions with Excellence! for storm and sanitary pipes will be obtained. Inlets that are clogged will be noted but will not have inverts obtained. Survey data will be collected to prepare a DTM model through the mapping limits. ROW & Property Lines We will utilize tax maps through the project limits in order to establish the existing ROW and property lines. Only property line stubs will be shown on the mapping with lot and block number labeled. Deed research is not included in this scope. Prepare Base Maps (3025) AmerCom will process the survey data, prepare a digital terrain model and prepare the base mapping in accordance with NJDOT standards. A baseline will be established tied to the survey control points. Conduct Initial Title Search (3028) AmerCom will only proceed with this task once potential ROW impacts are identified and we are authorized to proceed with this activity. AmerCom will coordinate the work with a NJ licensed Title Company to complete the title search. It is estimated that up to 15 properties will require a full 40-year title search. Tasks included under this activity are the following: • Title Search Coordination – We will hire and coordinate all work with a Title Search Company to obtain property records extending back to a 40-year search for up to 15 properties. The title search costs are maximum estimated amounts only and are subject to change based on the availability of records. Title searches that exceed the estimated costs in this proposal will be considered out of scope work. • Review Title Records & Plot Properties – We will review all title documents obtained for the 15 properties to identify current ownership, easements, encumbrances, monumentation and metes and bounds. Property lines and other data found from the title searches will be updated on the base plan. SUE Conduct Subsurface Utility Engineering (3080) AmerCom will coordinate the work with our subcontractor, InfraMap (see attached scope). It is noted West Orange Township requires curb to curb pavement restoration for any size excavation in the road. This type of pavement

Page 47

e the work with our subcontractor, InfraMap (see attached scope). It is noted West Orange Township requires curb to curb pavement restoration for any size excavation in the road. This type of pavement restoration work is cost prohibitive and not included in the scope. As a result, if test pits are required on the roadway pavement, this will be considered outside the scope of work. Our cost for this work is shown on the attached hourly cost breakdown. Thank you for this opportunity and please feel free to contact me with any questions. Very truly yours, AmerCom Corporation Mark V. Sheptock, P.E. Vice President

File revisions (1)