Supporting Documentation · Apr 28, 2026
129-26 (Exhibit A) STV-consultant-ageement_2026-01-05.pdf
ce3dc33c6f7d7241bcc0d9482fc70d2af2d8fb3d09f3e8b98b1345a9e5414c8dIndexed text · page 50
Show all pagesFIXED FEE CALCULATION PROJECT: SRTS West Orange – Gregory Ave. & Lowell Ave CONSULTANT: AmerCom Corp. AGREEMENT OR CAM NO. PREPARED BY: Mark Sheptock DATE: 8/21/2025 EVALUATE PROJECT SPECIFICS: Directions: Prime Consultant will use Total Project Design Cost (or Task Order Design Cost) for the SIZE criteria Each Subconsultant will assign points for SIZE, COMPLEXITY, DURATION, & DEGREE OF RISK based on its specific project tasks. SPECIFICS CRITERIA POINTS RATING SIZE: SMALL - Total Fee (Project Design Cost) < $1,250,000 15 15 LARGE - Total Fee (Project Design Cost) > $1,250,000 20 COMPLEXITY: SIMPLE - Limited Scope of Work; Deck Patching, Resurfacing, 10 10 Restoration, Inspection, Concept Development Services STANDARD - Moderate Scope; Rehabilitation, New, 15 or Reconstruction COMPLEX - Multi-disciplined, Highly Specialized, 20 or Major Unusual DURATION: STANDARD - Appropriate Schedule 15 15 AGGRESSIVE - Designers Schedule Reduced > 10 % 20 DEGREE OF RISK: LEVEL 1 - Low Risk of Claims; Studies, Surveys, 20 20 Landscape, Inspections LEVEL 2 - Average Risk of Claims; Standard Complexity 30 or Level 1 with High Public Exposure LEVEL 3 - High Risk of Claims; Hazardous, Experimental, 40 or Bonus/Penalty Clauses TOTAL RATING = 60 CALCULATE FEE: PROJECT SPECIFICS FACTOR (Total Rating /100) = 0.60 FEE FACTOR ( Project Specifics Factor x 0.30) =
PROJECT SPECIFICS FACTOR (Total Rating /100) = 0.60 FEE FACTOR ( Project Specifics Factor x 0.30) = 0.18 DIRECT LABOR COSTS $ 20,099.18 TOTAL FEE (Direct Labor Costs x Fee Factor) = $ 3,618 VERIFY THAT FEE FALLS WITHIN RANGE OF 6% TO 15%: CONSULTANT'S INTERIM OVERHEAD RATE ( % ) = 198.49% OVERHEAD (Labor x Overhead Rate) = $ 39,894.86 FIXED FEE RANGE [ Fee/(Labor + Overhead)] = 6.0%
File revisions (1)
- Sep 29, 2026
ce3dc33c6f7d2,051,122 bytes