606.03.02 Concrete Sidewalks, Driveways, and Islands THE FOLLOWING IS ADDED: Existing driveways to be sawcut at the limit of construction as shown on the plans or as directed by the Engineer. Sawcutting shall conform to Section 202. Existing driveways to be sawcut at the limit of construction as shown on the plans or as directed by the Engineer. Sawcutting shall conform to Section 202. Handicap ramps shall consist of construction of handicap ramps at existing radii as directed by the Engineer. The handicap ramps shall consist of removal of existing concrete sidewalk and curb/curb and gutter and construction of 9” X 18” concrete curb, monolithic curb and gutter, concrete sidewalk 4” thick, Public Ramp Delineation, (24” x 48” ADATILE ADA SOLUTIONS (OR APPROVED EQUAL) and whatever materials or resets are necessary to complete each individual ramp. The radii that will require complete handicap ramps will be those with existing curb and sidewalk or those with existing sidewalk but no curb. Those radii with curb only will be replaced with curb only and paid for under the item for 9” X 18” concrete vertical curb. Public Ramp Delineation on newly constructed and on existing handicap ramps shall be (24” x 48” ADATILE ADA SOLUTIONS (OR APPROVED EQUAL) installed as per manufacturer’s requirements. Permission will not be granted for monolithic pours. All concrete curb of various types must be poured separately from concrete sidewalk, 4” thick. THE FOLLOWING SUBPART(S) ARE ADDED: 606.03.05 Reset Pavers Excavation shall be in accordance with Section 202. DGABC to be placed and compacted in accordance with Section 401. Modular pavers in driveways to be placed on a concrete base course with a sand leveling bed. A ¾ to 1” setting bed consisting of stone dust should be applied over the concrete subbase conforming to ASTM C 33. When calculating bed levels, it is important to consider that the bricks will be compacted approximately 1/8” - ¼” into the setting bed with a plate vibrator during final steps of installation. Level setting bed with a straight edge to desired heights. Level, but do not compact. Only spread sufficient area that can be covered with Pavers the same day. Do not step in or disturb the setting bed in any manner. Place the paving bricks into position by hand, keeping joints as tight as possible. As soon as a sufficient area of bricks has been laid, the

Page 287

. Do not step in or disturb the setting bed in any manner. Place the paving bricks into position by hand, keeping joints as tight as possible. As soon as a sufficient area of bricks has been laid, the bricks are compacted into the setting bed with a high frequency, low amplitude plate vibrator. Units are pressed into setting bed and compacted. Joints are then filled with sand and brick pavers are vibrated until all joints are completely filled. Excess sand is removed. The only cutting of the bricks needed is at the boundaries. Cutting should be carried out with a diamond masonry saw. The pavement can be used by normal traffic as soon as it is completed. The sand to be used as joint fill should be stabilized with an organic additive “SANDLOCK” as provided by PAVE TECH INC. or approved equal. Materials and mixing procedures as indicated in the manufacturer’s specifications. The cost for this work shall be covered under the unit price bid for Concrete Modular Paver. As directed, Aluminum paver restraints shall be utilized along planters and green areas. Materials and installation procedures as indicated in the manufacturer’s specifications. The cost for this work shall be covered under the unit price bid for paver item. On resetting work, the Contractor shall carefully remove the existing pavers, clean, and store pavers for resetting once base course work is complete. Construction Tolerances for ADA Compatibility: HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 57 of 76

Page 288

In locations where pavers are set with the pedestrian area construction tolerances are to be met. The following are the tolerances published by the Interlocking Concrete Pavement Institute as a result of the project identified below: https://www.access-board.gov/research/completed-research/dimensional-tolerances/introduction Interlocking Concrete Pavement Institute Construction Tolerances for Segmental Concrete Pavements Setting Bed Joint Widths Construction Tolerances Materials Sand setting beds Joint width between adjacent 1/16 in. to 3/16 in. for concrete pavers units and paving slabs (See Figure I) Attribute Segmental Concrete Paving Construction Placement & Products & Characteristics Surface Tolerances Joint or bond lines All segmental concrete paving Maximum ±1/2 in. horizontal products: Horizontal deviation deviation from either side of a 50-ft. string line pulled over a joint or bond line Laying Pattern Concrete Pavers: 90 degree herringbone Surface smoothness All segmental concrete paving Maximum 1/8 in. products: Variation in height between adjacent units (lippage) Surface flatness All segmental concrete paving ±3/8 in. over 10 ft., products: Surface tolerance noncumulative 606.04 MEASUREMENT AND PAYMENT THE FOLLOWING PAY ITEMS ARE ADDED: Pay Item Pay Unit CONCRETE SIDEWALK, 4” THICK SQUARE YARD CONCRETE SIDEWALK, REINFORCED, 6” THICK SQUARE YARD HOT MIX ASPHALT DRIVEWAY, 2” THICK SQUARE YARD DETECTABLE WARNING

Page 288

CED, 6” THICK SQUARE YARD HOT MIX ASPHALT DRIVEWAY, 2” THICK SQUARE YARD DETECTABLE WARNING SURFACE SQUARE YARD RESET PAVERS SQUARE YARD THE FOLLOWING IS ADDED: HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 58 of 76

Page 289

New or resetting of Concrete/Clay Modular Pavers will be measured by the square yard. Square Yard cost to include labor in removing, storing and cleaning existing block, excavation, DGABC base course, plus materials and labor for construction of setting bed, pavers, edge restraint, joint fill and stabilization. When newly proposed curb-lines, walks or driveways cause gaps in adjacent existing concrete/clay modular paver walks or driveway the contractor shall provide additional matching pavers to fill in such gaps or fill in such gaps fill in such gaps as directed by the engineer. No separate payment shall be made. Payment for TOPSOILING, 4" THICK, FERTILIZING AND SEEDING, TYPE A-3 AND STRAW MULCHING shall be included under the various bid items in this section including but not limited to RESET PAVERS, CONCRETE SIDEWALK, _" THICK; CONCRETE SIDEWALK, REINFORCED, _" THICK; HOT MIX ASPHALT DRIVEWAY, _" THICK. Payment for 4” Dense Graded Aggregate Base Course shall be included under the various unit bid price items in this section including but not limited to CONCRETE SIDEWALK, _" THICK; CONCRETE SIDEWALK, REINFORCED, _" THICK; HOT MIX ASPHALT DRIVEWAY, _" THICK. All applicable unit bid price in this section shall include Excavation, Unclassified, pavement removal and disposal of all materials in order to construct in accordance with the plans and specifications. SECTION 607 – CURB 607.01 DESCRIPTION THE FOLLOWING IS ADDED: Pay items under this section shall include pavement repair strips adjacent constructed curbs consisting of DENSE-GRADED AGGREGATE BASE COURSE, HOT MIX ASPHALT 12.5M64 SURFACE COURSE and HOT MIX ASPHALT 19M64 BASE COURSE in accordance with section 302 & 401. Thickness of the various courses shall be in accordance with the pavement section as detailed or noted on the plans. Pay items under this section shall include TOPSOILING 4” THICK, FERTILIZING & SEEDING, TYPE AIII AND STRAW MULCHING restoration of adjacent grassed areas disturbed by construction in accordance with section 804, 806 & 809. 607.02 MATERIAL THE FOLLOWING IS ADDED: In addition to all materials listed in the section, material for the following items shall include: • PAVEMENT REPAIR STRIPS ADJACENT TO PROPOSED CURB LINE: o DENSE-GRADED AGGREGATE BASE COURSE shall be in accordance with section 302.02

Page 289

the following items shall include: • PAVEMENT REPAIR STRIPS ADJACENT TO PROPOSED CURB LINE: o DENSE-GRADED AGGREGATE BASE COURSE shall be in accordance with section 302.02 o HOT MIX ASPHALT 12.5M64 SURFACE COURSE shall be in accordance with section 401.02 o HOT MIX ASPHALT 19M64 BASE COURSE shall be in accordance with section 401.02. • TOPSOIL, FERTILIZING, SEEDING & STRAW MULCHING o Material shall consist of TOPSOILING, 4" THICK, FERTILIZING AND SEEDING, TYPE A-3 and STRAW MULCHING and shall be in accordance with subsections 804.02, 806.02 & 809.02. 607.03 CONSTRUCTION THE FOLLOWING IS ADDED TO THE BEGINNING: Cast-in-place concrete items shall not be constructed from November 1 to March 15 unless methods are reviewed and approved by the RE. THE FOLLOWING SUBPART(S) ARE ADDED: HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 59 of 76

Page 290

607.03.08 Pavement Repair Strips Adjacent to Constructed Curb-lines Construction for pavement repair strips adjacent to curbs consisting of DENSE-GRADED AGGREGATE BASE COURSE, HOT MIX ASPHALT 12.5M64 SURFACE COURSE, HOT MIX ASPHALT 19M64 BASE COURSE and shall be in accordance with subsections 302.03 & 401.043. 607.03.09 Topsoil, Fertilizing, Seeding & Straw Mulching Construction for TOPSOILING, 4" THICK, FERTILIZING AND SEEDING, TYPE A-3 and STRAW MULCHING and shall be in accordance with subsections 804.03, 806.03 & 809.03. 607.04 MEASUREMENT AND PAYMENT THE FOLLOWING PAY ITEMS ARE ADDED: Pay Item Pay Unit 9”X18” CONCRETE VERTICAL CURB LINEAR FOOT GRANITE CURB LINEAR FOOT THIS SUBSECTION IS CHANGED TO: Areas of granite and concrete curb unnecessarily disturbed or damaged during construction shall be replaced by the Contractor at no additional cost to the Township. THE FOLLOWING IS ADDED: Payment for DENSE-GRADED AGGREGATE BASE COURSE, HOT MIX ASPHALT 12.5M64 SURFACE COURSE, HOT MIX ASPHALT 19M64 BASE COURSE at pavement repair strips where adjacent to proposed curb-lines and as detailed on the plans shall be included under the various bid curb items in this section including but not limited to 9" X 18" CONCRETE VERTICAL CURB & GRANITE CURB. Payment for TOPSOILING, 4" THICK, FERTILIZING AND SEEDING, TYPE A-3 AND STRAW MULCHING shall be included under the various bid items in this section including but not limited to 9" X 18" CONCRETE VERTICAL CURB & GRANITE CURB. All applicable unit bid price in this section shall include Excavation, Unclassified, pavement removal and disposal of all materials in order to construct in accordance with the plans and specifications. SECTION 610 – TRAFFIC STRIPES, TRAFFIC MARKINGS, AND RUMBLE STRIPS 610.03.02 Traffic Markings Lines, Traffic Markings Symbols, and Traffic Markings Route Symbols THE SUBPART IS CHANGED TO: A. Marking Plan. At least 20 days before beginning the work, submit to the RE for approval a marking plan that includes: 1. Schedule of operations for applying traffic markings. 2. Number and type of equipment. 3. Manufacturer’s

Page 290

work, submit to the RE for approval a marking plan that includes: 1. Schedule of operations for applying traffic markings. 2. Number and type of equipment. 3. Manufacturer’s recommendations for use of the materials, including mixing ratios and application temperatures. 4. Details on the means and methods for surface preparation. 5. Details on the means and methods for premarking. B. Surface Preparation. Immediately before marking the pavement surface, clean the surface of dirt, oil, grease, and foreign material, including curing compound on new concrete. Clean the surface 2 inches beyond the perimeter of the marking to be placed. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 60 of 76

Page 291

C. Applying Traffic Markings. Place preformed thermoplastic or hot extruded thermoplastic traffic markings on thoroughly dry surfaces and during dry weather conditions. Apply using equipment and procedures that produce markings of the specified color, width, and thickness with well-defined edges, uniform retroreflectivity, and proper bonding to the pavement. Apply the thermoplastic material as follows: 1. Preformed Thermoplastic. Melt the preformed thermoplastic tape to bond the traffic markings permanently in position according to the manufacturer’s recommendations. Meet the minimum initial retroreflectance value, as specified in 610.03.01.D for thermoplastic tape, by applying additional glass beads to the hot-wet material in a uniform pattern as necessary. 2. Extruded Thermoplastic. Uniformly heat the thermoplastic material. When the ambient and surface temperatures are at least 50 °F, apply the melted material at a temperature of between 400 and 425 °F. Extrude the thermoplastic traffic markings on the HMA or concrete pavement ensuring a thickness of 90  1 mils. Immediately after, or in conjunction with the thermoplastic extrusion, uniformly apply glass beads to the wet material at a minimum rate of 10 pounds per 100 square feet of markings. Apply glass beads by mechanical means only. D. Applying Transverse Rumble Markings. Install transverse rumble markings as follows: 1. Ensure the HMA or concrete pavement is clean and dry before applying thermoplastic materials as specified in 610.03.02.B. 2. Heat thermoplastic material as specified in 610.03.02.C.2. 3. Apply one layer of thermoplastic material on the HMA or concrete pavement surface at a thickness of 125 ± 1 mils. Then while the material is hot, apply a second layer of thermoplastic material at 125 ± 1 mils. 4. Uniformly apply glass beads as specified in 610.03.02.C.2. 5. The Contractor will ensure that there is no separation between the first and second layer of thermoplastic material before the RE’s final acceptance of transverse rumble markings. 6. The Contractor will ensure that the appropriate thickness of 125 ± 1 mils per layer of thermoplastic material is installed, any markings found by the RE to be

Page 291

erse rumble markings. 6. The Contractor will ensure that the appropriate thickness of 125 ± 1 mils per layer of thermoplastic material is installed, any markings found by the RE to be thinner than 125 ± 1 mils will be removed and reinstalled by the Contractor at no additional cost to the Department. 7. The Department will make payment for transverse rumble markings by square feet under TRAFFIC MARKINGS SYMBOLS as specified in 610.04. 8. Thermoplastic material for transverse rumble markings shall be white in color. E. Performance. Ensure that the traffic markings show no fading, lifting, cracking, chipping for any reason including but not limited to traffic wear, maintenance activities including snow plowing, until Acceptance. Ensure that 60 days after application, traffic markings have a minimum retroreflectance value of: 375 millicandelas per square meter per lux for white traffic markings 250 millicandelas per square meter per lux for yellow traffic markings F. Defective work. Replace thermoplastic traffic markings that are determined by the RE before Acceptance to be defective or that are damaged during construction. Remove defective markings as specified in 610.03.08. Replace the entire area of thermoplastic traffic markings determined to be less than the required thickness, to have incorrect color or width, to have failed to bond to the pavement, or to have chipped or cracked. The minimum replacement area is an individual word or symbol, or for longitudinal lines the entire length from where the deficiency first occurs to where it no longer exists. The RE will determine initial retroreflectance as follows: Provide the RE with a Reflectometer that meets a 30 meter geometry as specified in ASTM E 1710, capable of measuring wet and dry conditions as specified in ASTM E 2176 and ASTM E 2177, and that has been certified by the manufacturer as being calibrated within the last 2 years. The RE will test the retroreflectance of traffic markings with the provided reflectometer according to the manufacturer’s recommendations. Replace traffic markings that do not meet the retroreflectance values indicated in 610.03.02.E. G. Opening to Traffic. Complete each application of thermoplastic traffic markings and allow to thoroughly dry