Show all pagesTOWNSHIP OF WEST ORANGE COUNTY OF ESSEX, NEW JERSEY ________________________________________ NJDOT MA 2025 HELEN AVENUE, LAWRENCE AVENUE, FLORENCE PLACE AND LOWELL AVENUE IMPROVEMENTS PROJECT ________________________________________ GENERAL REQUIREMENTS 1. LOCATION AND DESCRIPTION OF WORK The work generally consists of road reconstruction improvements, approximately 6,500 LF of new curb, approximately 12,000 SY of pavement milling, installation of approximately 1,700 tons of hot mix asphalt overlay, approximately 1,600 SY of concrete sidewalk, pavement markings, ADA compliant ramps, and regulatory and warning signage; all in accordance with the form of proposal, contract and specifications prepared by Greenman-Pedersen, Inc. (GPI), 301 Gibraltar Drive, Suite 2A, Morris Plains, New Jersey. 2. LINES AND GRADES The Contractor is responsible for performing the construction stakeout as part of the project. Grade sheets will be required where noted on the Construction Plans. 3. EXPLOSIVES AND BLASTING Explosives for blasting shall be stored, handled and used in accordance with the laws, ordinances and regulations of the State, County or Local government and with such additional regulations as the Engineer may require. Blasting shall be conducted so as not to endanger persons or property; and unless otherwise permitted, the Contractor shall be responsible for and shall make good any damage of whatever nature caused by blasting or accidental explosions. 4. WORKING CONDITIONS The Contractor shall provide working conditions on each operation that shall be safe and as healthful as the nature of the work permits. They shall inform themself of and shall comply with all safety and sanitary rules, laws and regulations. The Contractor shall maintain a safe drinking water supply readily available to all workers. A sufficient number of chemical type sanitary structures shall be provided for workmen on the project. They shall be located near the points of work. They shall be cleaned daily and shall be adequately serviced. 5. CARE AND PROTECTION OF WORK From the commencement of work until
project. They shall be located near the points of work. They shall be cleaned daily and shall be adequately serviced. 5. CARE AND PROTECTION OF WORK From the commencement of work until the completion of the same, the Contractor shall be solely responsible for the protection and care of the work covered by the Contract and for the material delivered to the site. All injury, damage or loss of the same from whatever cause, shall be made good at their expense. The Contractor shall take all necessary precautions to prevent injury or damage to the work by flood, freezing or inclement weather at any and all times. The methods used for this purpose shall be subject to approval by the Engineer. GR-1
File revisions (1)
- Sep 29, 2026
d927122a1dee2,795,700 bytes