6. SHOP DRAWINGS The Contractor shall furnish shop drawings, descriptive literature and other required information for all manufactured items. Five (5) copies shall be submitted to the Engineer for approval prior to fabrication. Approval by the Engineer of shop drawings for any material apparatus, device and layout shall not relieve the Contractor from the responsibility of furnishing same of proper dimension, size, quality, quantity and all performance characteristics to efficiently perform the requirements and intent of the Contract Documents. Approval shall not relieve the Contractor from responsibility for errors of any sort on the shop drawings. If the shop drawings deviate from the Contract Documents, the Contractor shall advise the Engineer of the deviations in writing, including the reasons for the deviations. Prior to the submittal of shop drawings of manufactured items, the Contractor shall check and approve the drawings. He shall indicate their approval by initials and date, and shall also indicate by reference the specifications and/or plan which covers the item. 7. MATERIALS AND MANUFACTURED ARTICLES All material and workmanship shall be subject to the approval of the Engineer and shall be in conformity with the approved modern practice. Wherever available, only manufactured and farm products of the United States shall be used in the performance of the work. When a reference is made in the Contract Documents to standards or specifications of associations such as AWWA, ASTM or others, the provisions of the latest revision of the standard or specifications shall be applicable. In all cases, new materials in first-class condition shall be used, unless this provision is waived by notice from the Owner or the Engineer in writing. In general, wherever the Contract Documents show or specify a particular make of material, manufactured article, device or equipment, it shall be regarded as a standard. If two or more makes of material, manufactured articles, devices or equipment are shown or specified, each should be regarded as the equal of the other. Any other make of material, manufactured article, device or equipment which is the recognized equal of that specified and is suitable for the purpose intended,

Page 101

ed as the equal of the other. Any other make of material, manufactured article, device or equipment which is the recognized equal of that specified and is suitable for the purpose intended, will be accepted upon approval by the Engineer, whose decision shall be final. In the event the Contractor obtains the Engineer's approval for the use of equipment other than that which is shown on the plans or specified herein, the Contractor shall at their own expense make any changes in the structures, buildings or piping necessary to accommodate the equipment. 8. WORK IN BAD WEATHER During freezing, stormy or inclement weather, no work shall be done except such as can be done satisfactorily and in a manner to secure first-class construction throughout. 9. NIGHT AND SUNDAY WORK Unless otherwise especially permitted, no work shall be done between the hours of 6:00 PM and 7:00 AM, nor on Sunday, except as necessary for the proper care and protection of work GR-2

File revisions (1)