Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 7, 2026

181-26 Exhibit A- Final Specifications_compressed.pdf

Preserved file SHA-256d927122a1dee77f264cb0cb9b28f927f58fc572c83b704e3a655d0eb2129bead

Indexed text · page 104

Show all pages
Page 104

writing and shall state the date, reason and approximate length of time of the inconvenience. 22. MAINTENANCE AND PROTECTION OF TRAFFIC The Contractor shall plan and carry out their work to provide for the convenient and safe passage of both vehicular and pedestrian traffic through the worksite area and along all detours if necessary. As noted on the Construction Plans, the road will be permitted to be closed from 8:00 a.m. to 5:00 p.m., Monday through Friday. The Contractor shall furnish, erect or place, and maintain, in good condition, barricades, signs, lights, traffic cones, barrels and pavement markings, and other warning and danger signals and devices, appropriate and adequate for the specific needs and subject to the Engineer's approval, at working sites, closed roads, intersections, open excavations, locations of material storage, standing equipment and other obstructions, at points where the usable traffic width of the road is reduced, at points where traffic is deflected from its normal courses or lanes, and at other places of danger to vehicular or pedestrian traffic or to completed work. This plan shall be reviewed and subject to approval by the Engineer. No outside employment job can be accepted without pre-payment of all necessary fees. If for unknown reasons the officers must work past the time requested, you will be billed for the extra time. When the officer works less than the time requested and you have pre-paid all fees required, you will be issued a refund. 23. COORDINATION WITH TOWNSHIP OPERATIONS The Contractor shall perform their work so as not to disrupt the day to day use of the facilities. The work shall be coordinated with the Maintenance Supervisor who is to be notified in advance of specific work items that the Contractor will perform. GR-5

File revisions (1)