Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 7, 2026

181-26 Exhibit A- Final Specifications_compressed.pdf

Preserved file SHA-256d927122a1dee77f264cb0cb9b28f927f58fc572c83b704e3a655d0eb2129bead

Indexed text · page 122

Show all pages
Page 122

NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT PREVAILING WAGE RATE DETERMINATION County - ESSEX Craft: Dockbuilder/Pile Driver PREVAILING WAGE RATE 05/01/25 Foreman W62.36 B53.74 T116.10 Foreman (Concrete Form W61.26 Work) B40.39 T101.65 Journeyman W54.23 B53.74 T107.97 Journeyman (Concrete W53.27 Form Work) B40.39 T93.66 Craft: Dockbuilder/Pile Driver APPRENTICE RATE SCHEDULE INTERVAL PERIOD AND RATES Yearly 21.69 27.12 35.25 43.38 Benefits 35.34 for all intervals Ratio of Apprentices to Journeymen - * * When there are 4 or fewer Dockbuilders/Pile Drivers on a job, no more than 1 may be an apprentice. When there are 5 or more Dockbuilders/Pile Drivers, there may be 1 apprentice for every 5 Dockbuilders/Pile Drivers. Craft: Dockbuilder/Pile Driver COMMENTS/NOTES APPRENTICE RATE SCHEDULE FOR CONCRETE FORM WORK ONLY: INTERVAL PERIOD AND RATES Yearly 21.31 26.64 34.63 42.62 Benefits 27.41 for all intervals NOTE: The following shall be required for type of work indicated- - There shall be one foreman and four journeymen on all land pile driving rigs. As part of the crew, one may be an apprentice. - There shall be one foreman and two journeymen on self -contained hydraulic driving rigs. As part of the crew, one may be an apprentice. - There shall be one foreman and two journeymen when driving sheeting with an excavator. As part of the crew, one may be an appprentice. - When utilizing a drill rig to install Auger cast piles there shall be one foreman and two journeymen. As part of the crew , one may be an apprentice. - There shall be one foreman and one journeyman on drilled or bored soldier piles. - There shall be

Page 122

piles there shall be one foreman and two journeymen. As part of the crew , one may be an apprentice. - There shall be one foreman and one journeyman on drilled or bored soldier piles. - There shall be one foreman and not less than one journeyman per rig on all drilled shaft and caissons. - There shall be one foreman and not less than one journeyman per rig on all earth retention tie-back and anchors. - There shall be one foreman and three joruneymen for driving of piles 60 feet or less. As part of the crew, one may be an apprentice. 2/5/2026 Page 17 of 71

File revisions (1)