Show all pagesSECTION 103 – AWARD AND EXECUTION OF CONTRACT 103.04 EXECUTION OF THE CONTRACT THIS SUBSECTION IS DELETED IN ITS ENTIRETY AND REPLACED BY THE FOLLOWING: Refer to CONTRACT AND AGREEMENT Section in the front end of these specification regarding award and execution of contract. 103.05 ESCROW BID DOCUMENTS 103.05.A ESCROW BID DOCUMENTS REVISE SECTION 103.05.A TO THE FOLLOWING: A. Purpose. The bid documents are the supporting information, calculations, quotes, and other information used to prepare the bid. The Department may use the Contractor’s bid documents to negotiate changes and claims if they are escrowed and a signed custody agreement is provided. The information contained in the bid documents does not modify the terms and conditions of the Contract. If the Contractor fails to escrow bid documents within the time specified in 103.04, the Department will not make payment for a disproportionate allocation of costs for work for which no Item is provided in the Contract, as specified in 102.08, in the renegotiation of costs of Items when there is a major decrease in quantity. SECTION 104 – SCOPE OF WORK 104.01 INTENT THE FIRST PARAGRAPH IS CHANGED TO: The intent of the Contract Documents is to describe a functionally complete and aesthetically acceptable Project to be constructed and completed by the Contractor in every detail according to the Contract Documents. Any work that may be reasonably inferred from the Contract Documents as being required to produce the intended result shall be supplied whether specifically called for. The Contractor is responsible to provide such elements to complete the Work under the pay items of the Contract for no Additional Compensation as provided under Subsection 109.02. However, as specified in the respective Subsections, adjustments may be allowed when the Township determines there is a discrepancy, error, omission, or latent ambiguity. It is understood that only the best construction practice is to prevail and only materials and workmanship of the first quality are to be used. ADD THE FOLLOWING: The work to be performed under this contract shall include: The work generally consists of road reconstruction improvements, approximately 6,500 LF of new curb, approximately 12,000 SY of pavement milling, installation of approximately
contract shall include: The work generally consists of road reconstruction improvements, approximately 6,500 LF of new curb, approximately 12,000 SY of pavement milling, installation of approximately 1,700 tons of hot mix asphalt overlay, approximately 2,200 SY of concrete sidewalk, pavement markings, ADA compliant ramps, and regulatory and warning signage. 104.02 VALUE ENGINEERING 104.02.01 Purpose and Scope THE FOLLOWING IS ADDED: The Department will not consider the following as (a) VE Proposal(s): HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 9 of 76
File revisions (1)
- Sep 29, 2026
d927122a1dee2,795,700 bytes