Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 7, 2026

181-26 Exhibit A- Final Specifications_compressed.pdf

Preserved file SHA-256d927122a1dee77f264cb0cb9b28f927f58fc572c83b704e3a655d0eb2129bead

Indexed text · page 256

Show all pages
Page 256

The Department will make payment for MOBILIZATION on a lump sum basis, regardless of the number of times the Contractor shuts down and returns to the Project. The Department will make payment as follows: Work Completed Payment 5% of the Work1 Lesser of 25% of bid price or 3% of Total Contract Price 10% of the Work1 Lesser of 50% of bid price or 7% of Total Contract Price 15% of the Work1 Lesser of 75% of bid price or 11% of Total Contract Price 20% of the Work1 Lesser of 100% of bid price or 15% of Total Contract Price 100% of the Work Amount of bid price not previously paid 1. If the baseline schedule is not approved, the Department will not make payment for MOBILIZATION. The Department will calculate the percentage of Work completed from the total of payments compared to the Total Contract Price. The total of payments excludes the amount paid for Mobilization and the amount paid for materials furnished but not incorporated into the Work as specified in 109.06. If mobilization is not included in the Proposal, include the costs in the various Items scheduled in the Proposal. SECTION 155 – CONSTRUCTION FIELD OFFICE THIS SECTION IS DELETED. SECTION 156 – MATERIALS FIELD LABORATORY AND CURING FACILITY THIS SECTION IS DELETED. SECTION 158 – SOIL EROSION AND SEDIMENT CONTROL AND WATER QUALITY CONTROL 158.04 SESC Measures THE FOLLOWING IS ADDED: The Department will measure and make payment for Items as follows: Item Pay Unit INLET FILTER, TYPE 1 SQUARE FOOT SECTION 159 – TRAFFIC CONTROL 159.02.01 Materials THE FIRST ITEM IS CHANGED TO:

Page 256

SQUARE FOOT SECTION 159 – TRAFFIC CONTROL 159.02.01 Materials THE FIRST ITEM IS CHANGED TO: Tack Coat 64-22 ............................................................................................................................................. 902.01.01 159.02.02 Equipment THE FOLLOWING EQUIPMENT IS CHANGED TO: Arrow Board ..................................................................................................................................................... 1001.01 THE FOLLOWING IS ADDED TO THE LIST OF EQUIPMENT REFERENCES: Portable Variable Message Sign w/Remote Communication…….………………...……………………1001.04 HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 26 of 76

File revisions (1)