T= G  C  0.00428 C= Petroleum content of the product Use 100% for Tack Coat 64-22 and Tack Coat 64E-22 Use 60% for Polymer Modified Tack Coat, and all other emulsified asphalts G= Gallons furnished The constant 0.00428 is derived from the conversion factor of tons per gallon using 8.345 lbs/gallon for water and a factor of 1.025 for the specific gravity of asphalt binder. The Department will not calculate an asphalt price adjustment for FOG SEAL STRIP. The monthly asphalt price index, as determined by the Department, will be the average of quotations from suppliers serving the area in which the Project is located, and will be determined by the Department. The Department will post the asphalt price index every month on the Department’s website: https://www.state.nj.us/transportation/business/aashtoware/PriceIndex.shtm. The Basic Asphalt Price Index will be the Index which is listed for the month prior to the receipt of bids. If the month prior to the receipt of bids has two Indexes, the Index in effect for the first day of the month will govern for the Basic Asphalt Price Index. The Monthly Asphalt Price Index will be that for the month that the work is constructed in. If work is constructed over the course of two or more months for a particular pay estimate, then multiple Monthly Indexes will be used corresponding to the date that the work was performed. If the Asphalt Price Index increases 50 percent or more over the basic asphalt price index, do not perform work on Items containing asphalt binder without written approval from the RE. 160.03.01 Fuel Price Adjustment THE ENTIRE SUBPART IS CHANGED TO: The Department will make price adjustments for fuel usage for Items listed in Table 160.03.01-1 and the Special Provisions. Each month may be divided into two periods. Period one includes the first day of the month through the fourteenth day of the month. Period two includes the fifteenth day of the month through the last day of the month. Work starting within period one and continuing past midnight of the fourteenth day into the fifteenth day of the month will be included in period one for any price adjustments. Work continuing past midnight of the last day of the month into the first day of the next month will be included in period

Page 261

th day of the month will be included in period one for any price adjustments. Work continuing past midnight of the last day of the month into the first day of the next month will be included in period two. The Department will calculate fuel price adjustments based on the pay quantities of listed Items using the fuel usage factors listed in Table 160.03.01-1 and the Special Provisions. Price adjustments may result in an increased payment to the Contractor for increases in the price index and may result in a reduction in payment for decreases in the price index. If the as-built quantity of an Item eligible for fuel price adjustment differs from the sum of the quantities in the Estimates and the as-built quantity cannot be readily distributed among the time periods that the Item was constructed, then the Department will determine fuel price adjustment by distributing the difference in the same proportion as the Item’s Estimate quantity is to the total of the Item’s time period estimates. Table 160.03.01-1 Fuel Price Adjustments Items Fuel Usage Factor EXCAVATION, UNCLASSIFIED 0.50 Gallons per Cubic Yard EXCAVATION, REGULATED MATERIAL 0.50 Gallons per Cubic Yard EXCAVATION, ACID PRODUCING SOIL 0.50 Gallons per Cubic Yard REMOVAL OF PAVEMENT 0.25 Gallons per Square Yard MICRO-MILLING 0.25 Gallons per Square Yard HMA MILLING, 3" OR LESS 0.25 Gallons per Square Yard HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 31 of 76

File revisions (1)