Supporting Documentation · Jul 7, 2026
181-26 Exhibit A- Final Specifications_compressed.pdf
d927122a1dee77f264cb0cb9b28f927f58fc572c83b704e3a655d0eb2129beadIndexed text · page 267
Show all pagesDIVISION 200 – EARTHWORK SECTION 201 – CLEARING SITE 201.01 DESCRIPTION THE FOLLOWING IS ADDED: Clearing Site shall also include the removal and/or resetting/relocation of all signs, the repair of any damaged sprinklers, concrete sign posts, fences and all existing features/obstructions, either standing or felled within the limits of construction of the project, as shown on the plans or as directed by the engineer, for which no specific pay item is provided for in the contract. Work also includes removal of pavement reflectors and castings. All trees less than 6” in diameter as measured at 4’ from grade will be removed under this item. Tree trimming of all trees as directed by the Township will be included under this item. In the performance of the work under this item, the Contractor will be held responsible for any damage to existing construction that is to remain in place. The Contractor shall use extreme care and exercise every precaution necessary to prevent damage or injury thereto. Any damage as a result of the Contractor's operations shall be repaired or replaced by him to the satisfaction of the Engineer at no additional expense to the Township. 201.03.01 Clearing Site PART A IS CHANGED TO: A. Preparation. Construct SESC measures, as specified in 158.03.02, before clearing site. 201.04 MEASUREMENT AND PAYMENT THE SUBSECTION IS CHANGED TO: The Department will measure and make payment for Items as follows: Item Pay Unit CLEARING SITE LUMP SUM THE FOLLOWING IS ADDED: CLEARING SITE to be paid as follows: • 25% Paid upon completion of all drainage improvements or a reduced percentage as determined by the engineer should all drainage improvements not be completed at the time of an intermediate payment. • 25% Paid Upon completion of concrete curb/sidewalk/driveway improvements or a reduced percentage as determined by the engineer should all concrete curb/sidewalk/driveway not be completed at the time of an intermediate payment. • 25% Paid upon completion of all Hot Mix Asphalt Items or a reduced percentage as determined by the engineer should all Hot Mix Asphalt Items not be
of an intermediate payment. • 25% Paid upon completion of all Hot Mix Asphalt Items or a reduced percentage as determined by the engineer should all Hot Mix Asphalt Items not be completed at the time of an intermediate payment. • 25% shall be retained and paid upon final payment. SECTION 202 – EXCAVATION 202.01 DESCRIPTION THE FOLLOWING IS ADDED: HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 37 of 76
File revisions (1)
- Sep 29, 2026
d927122a1dee2,795,700 bytes