Supporting Documentation · Jul 7, 2026
181-26 Exhibit A- Final Specifications_compressed.pdf
d927122a1dee77f264cb0cb9b28f927f58fc572c83b704e3a655d0eb2129beadIndexed text · page 280
Show all pagesItem Pay Unit HMA MILLING, 3" OR LESS SQUARE YARD HOT MIX ASPHALT 12.5M64 SURFACE COURSE TON HOT MIX ASPHALT 19M64 BASE COURSE TON The specified depth of the milling is measured from the original surface to the top of the high spots of the textured surface. The Township will measure HMA 12.5M64 Surface Course, and HMA 19M64 base course by the ton as indicated on the certified weight tickets, excluding unused material. Areas unnecessarily disturbed or damaged by the contractor will not be included in the measurement. No separate or individual payment shall be made for TACK COAT. Payment for TACK COAT shall be included under the various bid items in this section including but not limited to Hot Mix Asphalt__ Surface Course & Hot Mix Asphalt__ Base Course. No separate or individual payment shall be made for RESET WATER VALVE BOX. Payment for RESET WATER VALVE BOX shall be included under the various bid items in this section including but not limited to Hot Mix Asphalt__ Surface Course & Hot Mix Asphalt__ Base Course. No separate or individual payment shall be made for RESET GAS VALVE BOX. Payment for RESET GAS VALVE BOX shall be included under the various bid items in this section including but not limited to Hot Mix Asphalt__ Surface Course & Hot Mix Asphalt__ Base Course. No separate or individual payment shall be made for HMA LONGITUDINAL JOINT REPAIR. Payment for HMA LONGITUDINAL JOINT REPAIR shall be included under the various bid items in this section including but not limited to Hot Mix Asphalt__ Surface Course & Hot Mix Asphalt__ Base Course. The Department will make a payment adjustment for HMA air void quality per lot by the following formula: Pay Adjustment Per HMA Lot = - Q x BP x Reduction Per Lot (%) Where: BP = Bid Price of HMA Q= Quantity of HMA in lot receiving payment adjustment Reduction Per Lot (%) = Air void Reduction (%) per lot as specified in 401.03.07.H. The Department will make a
f HMA Q= Quantity of HMA in lot receiving payment adjustment Reduction Per Lot (%) = Air void Reduction (%) per lot as specified in 401.03.07.H. The Department will make a payment adjustment for HMA thickness quality per lot by the following formula: Pay Adjustment Per HMA Lot = - Q x BP x Percent Reduction (%) Where: BP = Bid Price of HMA Q= Quantity of HMA in lot receiving payment adjustment Percent Reduction (%) = Thickness Percent Reduction (%) per lot as specified in 401.03.07.I. The Department will make a payment adjustment for HMA ride quality, as specified in 401.03.07.J. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 50 of 76
File revisions (1)
- Sep 29, 2026
d927122a1dee2,795,700 bytes