UNDERDRAIN, 6" PERFORATED HIGH DENSITY POLYETHYLENE PIPE: The pay item for UNDERDRAIN, 6" PERFORATED HIGH DENSITY POLYETHYLENE PIPE shall be constructed in accordance with all appliable construction methods of this section. Additionally, the pay item shall include all labor necessary to construct in accordance with the plans or as directed in the field. Preliminary pavement restoration above pipe trenches in the roadway shall be constructed in accordance with section 401.03. 15” REINFORCED CONCRETE PIPE, CLASS V: The pay item for 15” REINFORCED CONCRETE PIPE, CLASS V shall be constructed in accordance with all appliable construction methods of this section. Additionally, the pay item shall include all labor necessary to construct in accordance with the plans or as directed in the field. Preliminary pavement restoration above pipe trenches in the roadway shall be constructed in accordance with section 401.03. 601.04 MEASUREMENT AND PAYMENT REVISE THE SECOND PARAGRAPH TO: When the RE directs undercutting of unstable material in a pipe trench, the Department will make payment for the additional excavation. The Department will also make payment, for the additional bedding if there is not an excess of excavation available. THE FOLLOWING PAY ITEMS ARE ADDED: Pay Item Pay Unit UNDERDRAIN, 6” PERFORATED HIGH DENSITY POLYTHYLENE PIPE LINEAR FEET 6” POLYVINYL CHLORIDE PIPE LINEAR FEET CURB DRAIN CONNECTION, INCLUDING CLEANOUT UNIT 15” REINFORCED CONCRETE PIPE, CLASS V LINEAR FEET THE FOLLOWING IS ADDED: All pay items under this section within the roadway surface shall include the cost of preliminary pavement restoration of HOT MIX ASPHALT 19M64 BASE COURSE in accordance with section 401. The unit bid price for CURB DRAIN CONNECTION, INCLUDING CLEANOUT shall include, but not be limited to schedule 40 PVC pipe, fittings, adapters, connecting to the existing or proposed pipe, coarse aggregate No. 57, excavation unclassified, virgin dense graded aggregate, preliminary pavement restoration, and all equipment, labor and

Page 283

, adapters, connecting to the existing or proposed pipe, coarse aggregate No. 57, excavation unclassified, virgin dense graded aggregate, preliminary pavement restoration, and all equipment, labor and materials necessary to construct in accordance with plans. The unit bid price for UNDERDRAIN, 6" PERFORATED HIGH DENSITY POLYETHYLENE PIPE, shall include, but not be limited to Perforated High Density Polyethylene Pipe dual walled ADS N-12 or approved equal, HDPE fittings, filter sleeve/sock, filter fabric, coarse aggregate No. 57, virgin dense graded aggregate, preliminary pavement restoration, and all equipment, labor and materials necessary to construct in accordance with plans. The unit bid price for 15” REINFORCED CONCRETE PIPE, CLASS V, shall include, but not be limited to Reinforced Concrete Pipe, Class V or approved equal, fittings, coarse aggregate No. 57, virgin dense graded aggregate, preliminary pavement restoration, and all equipment, labor and materials necessary to construct in accordance with plans. SECTION 602 – DRAINAGE STRUCTURES 602.01 DESCRIPTION THE FOLLOWING IS ADDED: • This section shall also include all the requirements of section 652 for the purposes of Setting Castings on Sanitary Manholes, Resetting Sanitary Manhole Castings & Reconstructing Sanitary Manholes HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 53 of 76

File revisions (1)