The term "NEMA" shall mean the National Electric Manufacturers Association. The term "AWS" shall mean the American Welding Society. The term "BOCA" shall mean Building Code Officials and Code Administration International, Inc. The term "ACI" shall mean the American Concrete Institute. The term "NFPA" shall mean the National Fire Protection Association. The words "as described," "as required," "as permitted," "as allowed," or phrases of like effect or import as used herein shall mean that the direction, requirement, permission, or allowance of the Engineer is intended, and similarly, the words "approved," "reasonable," "suitable," "properly," "satisfactory," or words of like effect or import, unless otherwise particularly specified herein, shall mean approve, reasonable, suitable, properly, or satisfactory in the judgment of the Engineer. SECTION 4 - ENGINEER'S DECISIONS All work under this Contract shall be done to the satisfaction of the Engineer who shall determine the amount, quality, acceptability, and fitness of the several items of work and materials which are to be paid for hereunder. The Engineer shall also decide all questions which may arise as to the fulfillment of the terms of the Contract by the Contractor, and as to the intent and purpose of the Contract Plans and Specifications. The determination of the Engineer in all such matters shall be final and binding upon the parties thereto. SECTION 5 - INSPECTION The Owner, at their own expense, has appointed and employed the Engineer whose duty it is to observe and inspect, in the Owner's interest, the materials furnished, and the work done as the work progresses in order to insure full and complete compliance with the Contract. It is agreed that the Owner may also, at its pleasure and at its own expense, appoint and employ such other persons as may be necessary for those purposes. The Engineer and all such other persons referred to shall have unrestricted access to all parts of the work and to other places at and in which the preparation of the materials and other parts of the work to be done under this Contract are carried on and conducted and shall be given by the Contractor all facilities and assistance required to carry out their work of observation and inspection. It is not the function of the Engineer to supervise or direct the manner in which the work to be done under this Contract

Page 88

nd assistance required to carry out their work of observation and inspection. It is not the function of the Engineer to supervise or direct the manner in which the work to be done under this Contract is carried on or conducted. Nevertheless, the Contractor agrees that any method of procedure, which in the opinion of the Engineer does not achieve the required results or quality of the work specified, shall be discontinued immediately upon the order of the Engineer. The Engineer shall have the authority to reject any work, or materials, or any part thereof, which does not in their opinion conform to the Plans, Drawings, Specifications, and Contract, and it shall be permissible for them to do so at any time during the progress of the work and until its acceptance. No work shall be done except in the presence of designated representatives of the Owner or the Engineer and no material of any kind shall be used upon the work until it has been inspected and accepted by such duly authorized representatives. All materials rejected shall be removed immediately from the work and not again offered for inspection. Any materials or workmanship found at any time to be defective or not of the quality or character required by the Plans and Specifications shall be remedied at once regardless of previous inspection. GC-2

File revisions (1)