Supporting Documentation · Aug 18, 2026
236-26 EZ Speed Study Program and Application - Final.pdf
096fadd9edaaa056db159ba2989bf9b1f34df8d7b1f55990ea882b7ca3a74adaIndexed text · page 2
Show all pages2 | P a g e EZ Speed Study Program Application and Agreement Form Equipment for Program Includes ○ One Traffic Logix Evolution Radar Speed Display Unit ○ Mounting bracket and hardware for the device. Term The standard term of a speed study is between fourteen (14) days to twenty-eight (28) days. Upon receiving a completed application and certificate of insurance, the applicant/Borrower will be added to the request queue. Placement Conditions • The Equipment needs to be mounted to a sturdy, upright channel post (the type with holes down the middle). Preference is to place the Equipment under an existing speed limit sign to make it obvious how fast the driver should be traveling. • The Equipment must be mounted 7-8 feet high from the surface of the paved road. The channel post cannot be in a ditch or shallow area. • The Equipment should be mounted along a relatively straight stretch of road where there are not any cross streets or busy driveways that could interfere with data recording. Placing the Equipment too close to a cross street will reduce the speed averages as it records the slower speed of turning vehicles. • The Equipment must be mounted where there is a clear visual field for the radar to detect vehicles and the device is visible to oncoming vehicles. The Equipment may not be placed where obstructions such as tree limbs and other signs on the road will interfere with visibility and radar sensitivity. Borrower Information: ____________________________________________________________________________ School/Municipality Primary Contact Name: ___________________ _______________________ _____________________________ First Name Last Name Title/Position ___________________________________ _____________________________ Street Address City and Zip
File revisions (1)
- Sep 29, 2026
096fadd9edaa233,052 bytes