Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 15, 2026

250-26 Shauger Invoice E-114656.pdf

Preserved file SHA-256c341b5c14dd497fb6c9538c773f222e884217e2c65beb9195995771b2dd6864f

Indexed text · page 5

Show all pages
Page 5

ae SHAUGER PROPERTY SERVICES, INC , INC. INVOICE BREAKDOWN OWNER [TOWNSHIP OF WEST ORANGE DPW _ key 261410944 PC26-014 PROJECT ADDRESS: |PARK TERRACE, FRANKLIN AVENUE & MAIN STREET, CITY OF WEST ORANGE | DISPOSAL OF ASPHALT OR CONCRETE / TON 22.00 ™ |$ 59.50/$ 1,309.00 |All American Sewer Service Inc 8106470 DISPOSAL OF CLEAN SOIL/TON 73.00 | IN |$ 3950/3 3,120.50 | Straight Edge Striping 9968S unor/0oaw/ mucking Ton nics Cee Ge Seen Poa ec ee Ce | STONE - 3/4" CLEAN W/ TRUCKING / TON: 3.50 ™ |$ 29.50/$ 103.25 | TOTAL SUBCONTRACT: | ASPHALT BASE MIX WELDON: N $ 87.23) $ 1,218.60 | ASPHALT SURFACE COURSE WELDON 3.98 IN $s 90.23|3 359.12 | EXTRA DUTY SOLUTIONS: X070.704449 $3,790.84) era oan ae el | CONCRETE READY MIX 5000 PSI 28.00 Bo |$ 9.26/3 259,28 OKAGTE TYPES Hx ste [Uso [ease el |RAPID SET 25LBS CEMENT 5.00 EA $s 20.87|$ 104.35, en en (el Pe |r ae on ee PS ee GUAM HANOGUARO FLOOR HSL a ee ere err |3/4" X 12" GUARDIAN HANDGUARD CHISEL 1.00 FA |$ 21.97/$ 21.97 aoa a ARATE De ee TOTAL MATERIAL: $11,477.49] TOTAL TRAFFIC CONTROL: $10,398.00] |Labor Cost $16,171.13] Markup on Labor I 21% I $3,815.94) $11,477.49] [Markup on Material L 21% I 32,410.27) |Equipment Cost ($17,880.17) [Markup on Equipment, L 0% I $0.00] Subcontractor Cost $3,303.58] [Markup on Subcontractors. L 10% T $330.36] Traffic Contral Cost: $10,398.00) /Markup on Traffic Control: 0% $0.00) O OTA $67,786.94 2o0f2

File revisions (1)