Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 15, 2026

256-26 Proposal - 10 Rooney_Cir_Restrooms.pdf

Preserved file SHA-2566eec7c2231a534372739433fd06a68c64c04f27595b8d4e0b5052bd2fa4755bc

Indexed text · page 1

Show all pages
Page 1

HERBST-MUSCIANO, LLC Architecture & Planning New Jersey Certificate of Authorization AC 830 611 Main Street, Second Floor, Boonton, New Jersey 07005 Tel 973 538 3815 Fax 973 538 4095 www.herbstmusciano.com REVISED August 13, 2026 July 30, 2026 James Latore, Superintendent Department of Public Works Township of West Orange 25 Lakeside Dr, West Orange, NJ A/E SERVICES PROPOSAL FOR: Interior Alterations for Restrooms Improvements Second Floor Tenant 10 Rooney Circle, West Orange, NJ A. PROJECT DESCRIPTION 1. Herbst-Musciano, LLC will provide architectural design, engineering and construction contract administration for the interior alterations to men's and women's rooms on the second floor of 10 Rooney Circle. 2. The project will generally include to the following: a. Remove all wall stainless steel trash bins b. Remove all paper towel dispensers c. We are assuming that the building's janitorial service will provide paper towel dispensers. d. Toilet seat cover dispenser e. Stainless steel floor mounted trash container with flip-up top cover. f. New stainless steel toilet partitions g. Solid surface vanity tops with new wash basins and faucet h. New wall tile on vanity walls i. Remove existing mirrors j. New wall mirrors at each wash basin location. k. Remove 1 water closet at Women's Lobby Toilet Room l. New toilet tissue dispensers m. Remove all wall mounted trash receptacles, towel dispensers and feminine napkin dispensers - replace with West Orange Approved units. n. Patch and repair walls at all removals o. New accessible (36"W) door, frame and ADA hardware at Lobby entrance to Locker Room. p. Replace al shower enclosures shower faucets, curtains and rods, shower heads and floor drains. q. Replace all accessibility accessories, such as seat, grab bars, etc. r. Miscellaneous repairs s. Remove wall paper, patch and paint walls t. Replace Ceiling Tiles u. NJUCC Accessibility improvements where feasible v. Replace exhaust fans B. ARCHITECTURAL DESIGN SERVICES 1. CONSTRUCTION DOCUMENTS PHASE i. Field work measurement and documentation of conditions. ii. These documents will consist of Drawings and specifications setting forth in detail the requirements for the construction of the project. iii. Construction Documents will be prepared for the work described in Section A above. 2. CONSTRUCTION CONTRACT ADMINISTRATION PHASEEXHIBIT A PROPOSAL FOR SERVICES

File revisions (1)