Supporting Documentation · Oct 13, 2026
275-26 AIA Payment Application No. 1 - 28 Sep 2026.pdf
8cb442c6fa48d5af9a53af53b70b4ecaa14eea049889ef4cec489440d46d76d1Indexed text
APPLICATION AND CERTIFICATE FOR PAYMENT Page 1 of 2 TO OWNER: PROJECT: APPLICATION NO: 1 Distribution to: Township of West Orange - Dept. of Engineering Short Hills Pump Station APPLICATION DATE: 9/28/2026 __Owner 25 Lakeside Ave Emergency Repairs PERIOD TO: 9/25/2026 __Architect West Orange, NJ 07052 PROJECT NO: C470 __Contractor FROM CONTRACTOR: VIA ENGINEER: CONTRACT DATE: CFM Construction, Inc. Van Cleef Engineering Associates, LLC INVOICE NO.: 1-2526 5 Bay Street 1705 Route 37 East, Toms River, NJ 08753 Stirling, New Jersey 07980 CONTRACT FOR: CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, informa- Application is made for payment, as shown below, in connection tion and belief the Work covered by this Application for Payment has been completed in accor- with the Contract, Continuation Sheet is attached. dance with the Contract Documents, that all amounts have been paid by the contractor for Work for which previous Certificates for Payment were issued and payment received from the 1. ORIGINAL CONTRACT SUM……………………………………………….. 880,000.00 Owner, and that current payment shown herein is now due. 2. Net Change by Change Orders……………………………………………. 3. CONTRACT SUM TO DATE (Line 1+2)……………………………………. 880,000.00 CONTRACTOR: 4. TOTAL COMPLETED AND STORED TO DATE……………………………. 202,600.00 (Column G on continuation sheet) By:______________________________________________ Date__________________ 5. RETAINAGE: a. 0% of Completed Work ($191,000.00) ……………… - State of: New Jersey (column D+E on continuation sheet) County of: Morris b. 2% of Stored Material ($0.00) ………………. Subscribed and sworn to before (column F on continuation sheet) me this 28th day of September 2026 Total Retainage (Line 5a + 5b or total of column I on continuation sheet)…………………… - 6. TOTAL EARNED LESS RETAINAGE………………………………………. 202,600.00 Notary Public: _______________________________________________________ (Lines 4 less Line 5 Total) My Commission Expires: 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate)……………………………………………… - ENGINEER'S CERTIFICATE FOR PAYMENT 8. CURRENT PAYMENT DUE………………………………………………….. 202,600.00 9. BALANCE TO FINISH, INCLUDING RETAINAGE In accordance with the Contract Documents, based on on-site observation and the data com- (Line 3 less Line 6)………………………………………………………….. 677,400.00 prising this
9. BALANCE TO FINISH, INCLUDING RETAINAGE In accordance with the Contract Documents, based on on-site observation and the data com- (Line 3 less Line 6)………………………………………………………….. 677,400.00 prising this application, the Engineer certifies to the Owner that to the best of the Engineer's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the contractor is entitled to payment ADDITIONS DEDUCTIONS of the AMOUNT CERTIFIED. Total changes approved in previous months by owner - - AMOUNT CERTIFIED……………………………………………………………….. 202,600.00 Total approved this month - - ENGINEER: TOTALS - - By:______________________________________________ Date_______________ NET CHANGES by change order - This certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner of Contractor under this Contractor. CHANGE ORDER SUMMARY
CONTINUATION SHEET Page 2 of 2 APPLICATION AND CERTIFICATE FOR PAYMENT, PROJECT: APPLICATION NO.: 1 containing Contractor's signed Certification, is attached. Short Hills Pump Station Emergency Repairs APPLICATION DATE: 9/28/2026 In tabulation below, amounts are stated to the nearest dollar. PERIOD TO: 9/25/2026 Use Column I on Contracts where variable retainage for line items may apply. PROJECT NO.: C470 A B C D E F G H I MATERIALS TOTAL COMP. PERCENT (%) SCHEDULED FROM PREV. THIS PRESENTLY AND STORED COMPLETED BALANCE RETAINAGE ITEM VALUE APPLICATIONS PERIOD STORED TO DATE TO DATE TO FINISH (If Variable No. DESCRIPTION OF WORK (D+E) (Not in D or E) (D+E+F) (G/C) (C-G) Rate) Engineering & Non-Electric Construction 618,400.00 - 154,500.00 - 154,500.00 25.0% 463,900.00 1.01 Engineering - Design & Construction Services 97,500.00 - 72,000.00 - 72,000.00 73.8% 25,500.00 1.02 PSE&G Fees - Temp Service & 480V Upgrade 27,600.00 - 27,600.00 - 27,600.00 100.0% - 1.03 Field Investigation - Flow & TDH Measurements 7,500.00 - 7,500.00 - 7,500.00 100.0% - 1.04 Set up & maintain emergency bypass pumping 75,000.00 - 37,500.00 - 37,500.00 50.0% 37,500.00 1.05 Demolition & disposal of exist mechanical equip. 30,000.00 - - - - 0.0% 30,000.00 1.06 Construction of concrete piers for pumps 20,000.00 - - - - 0.0% 20,000.00 1.07 Installation of Wilo pumps on concrete supports 25,000.00 - - - - 0.0% 25,000.00 1.08 Pipe, fittings, plug & check valves, flowmeter mat. 45,000.00 - - - - 0.0% 45,000.00 1.09 Installation of pump suction & discharge headers 40,000.00 - - - - 0.0% 40,000.00 1.10 Supply and install new dry well sump pump 8,500.00 - - - - 0.0% 8,500.00 1.11 Cleaning & coating DW & PS bldg w/epoxy paint 42,000.00 - - - - 0.0% 42,000.00 1.12 Cleaning & coating WW interior with epoxy paint 70,800.00 - 2,400.00 - 2,400.00 3.4% 68,400.00 1.13 Supply and install submersible mixer in wet well 35,000.00 - - - - 0.0% 35,000.00 1.14 Supply and install wet well aluminum hatch 7,500.00 - - - - 0.0% 7,500.00 1.15 Construction of stand-by generator concrete pad 12,000.00 - - - - 0.0% 12,000.00 1.16 Supply and install gas stand-by generator & ATS 75,000.00 - 7,500.00 - 7,500.00 10.0% 67,500.00 Electrical Construction 261,600.00 - 48,100.00 - 48,100.00 18.4% 213,500.00 1.17 Installation of temporary electrical service 8,000.00 - 8,000.00 - 8,000.00 100.0% - 1.18 Wiring of bypass pumping
0.00 Electrical Construction 261,600.00 - 48,100.00 - 48,100.00 18.4% 213,500.00 1.17 Installation of temporary electrical service 8,000.00 - 8,000.00 - 8,000.00 100.0% - 1.18 Wiring of bypass pumping equiqment & controls 5,800.00 - 2,900.00 - 2,900.00 50.0% 2,900.00 1.19 Demolition and disposal of exist. electrical equip. 11,500.00 - - - - 0.0% 11,500.00 1.20 Installation of underground service conduits 17,000.00 - - - - 0.0% 17,000.00 1.21 Service equipment and grounding materials 23,600.00 - - - - 0.0% 23,600.00 1.22 Installation of service equipment and grounding 35,600.00 - - - - 0.0% 35,600.00 1.23 Wiring of stand-by generator and ATS 17,000.00 - - - - 0.0% 17,000.00 1.24 Wet well wiring 11,500.00 - - - - 0.0% 11,500.00 1.25 Dry well wiring 23,000.00 - - - - 0.0% 23,000.00 1.26 Supply, install & wire Pumps/Mixer Control Panel 60,200.00 - 37,200.00 - 37,200.00 61.8% 23,000.00 1.27 Power wiring 23,000.00 - - - - 0.0% 23,000.00 1.28 Lighting 17,000.00 - - - - 0.0% 17,000.00 1.29 Startup and testing 5,400.00 - - - - 0.0% 5,400.00 1.30 Vibration Analysis and report 3,000.00 - - - - 0.0% 3,000.00 Total Contract 880,000.00 - 202,600.00 - 202,600.00 23.0% 677,400.00 WORK COMPLETED
File revisions (1)