Show all pagesCONTINUATION SHEET Page 2 of 2 APPLICATION AND CERTIFICATE FOR PAYMENT, PROJECT: APPLICATION NO.: 1 containing Contractor's signed Certification, is attached. Short Hills Pump Station Emergency Repairs APPLICATION DATE: 9/28/2026 In tabulation below, amounts are stated to the nearest dollar. PERIOD TO: 9/25/2026 Use Column I on Contracts where variable retainage for line items may apply. PROJECT NO.: C470 A B C D E F G H I MATERIALS TOTAL COMP. PERCENT (%) SCHEDULED FROM PREV. THIS PRESENTLY AND STORED COMPLETED BALANCE RETAINAGE ITEM VALUE APPLICATIONS PERIOD STORED TO DATE TO DATE TO FINISH (If Variable No. DESCRIPTION OF WORK (D+E) (Not in D or E) (D+E+F) (G/C) (C-G) Rate) Engineering & Non-Electric Construction 618,400.00 - 154,500.00 - 154,500.00 25.0% 463,900.00 1.01 Engineering - Design & Construction Services 97,500.00 - 72,000.00 - 72,000.00 73.8% 25,500.00 1.02 PSE&G Fees - Temp Service & 480V Upgrade 27,600.00 - 27,600.00 - 27,600.00 100.0% - 1.03 Field Investigation - Flow & TDH Measurements 7,500.00 - 7,500.00 - 7,500.00 100.0% - 1.04 Set up & maintain emergency bypass pumping 75,000.00 - 37,500.00 - 37,500.00 50.0% 37,500.00 1.05 Demolition & disposal of exist mechanical equip. 30,000.00 - - - - 0.0% 30,000.00 1.06 Construction of concrete piers for pumps 20,000.00 - - - - 0.0% 20,000.00 1.07 Installation of Wilo pumps on concrete supports 25,000.00 - - - - 0.0% 25,000.00 1.08 Pipe, fittings, plug & check valves, flowmeter mat. 45,000.00 - - - - 0.0% 45,000.00 1.09 Installation of pump suction & discharge headers 40,000.00 - - - - 0.0% 40,000.00 1.10 Supply and install new dry well sump pump 8,500.00 - - - - 0.0% 8,500.00 1.11 Cleaning & coating DW & PS bldg w/epoxy paint 42,000.00 - - - - 0.0% 42,000.00 1.12 Cleaning & coating WW interior with epoxy paint 70,800.00 - 2,400.00 - 2,400.00 3.4% 68,400.00 1.13 Supply and install submersible mixer in wet well 35,000.00 - - - - 0.0% 35,000.00 1.14 Supply and install wet well aluminum hatch 7,500.00 - - - - 0.0% 7,500.00 1.15 Construction of stand-by generator concrete pad 12,000.00 - - - - 0.0% 12,000.00 1.16 Supply and install gas stand-by generator & ATS 75,000.00 - 7,500.00 - 7,500.00 10.0% 67,500.00 Electrical Construction 261,600.00 - 48,100.00 - 48,100.00 18.4% 213,500.00 1.17 Installation of temporary electrical service 8,000.00 - 8,000.00 - 8,000.00 100.0% - 1.18 Wiring of bypass pumping
0.00 Electrical Construction 261,600.00 - 48,100.00 - 48,100.00 18.4% 213,500.00 1.17 Installation of temporary electrical service 8,000.00 - 8,000.00 - 8,000.00 100.0% - 1.18 Wiring of bypass pumping equiqment & controls 5,800.00 - 2,900.00 - 2,900.00 50.0% 2,900.00 1.19 Demolition and disposal of exist. electrical equip. 11,500.00 - - - - 0.0% 11,500.00 1.20 Installation of underground service conduits 17,000.00 - - - - 0.0% 17,000.00 1.21 Service equipment and grounding materials 23,600.00 - - - - 0.0% 23,600.00 1.22 Installation of service equipment and grounding 35,600.00 - - - - 0.0% 35,600.00 1.23 Wiring of stand-by generator and ATS 17,000.00 - - - - 0.0% 17,000.00 1.24 Wet well wiring 11,500.00 - - - - 0.0% 11,500.00 1.25 Dry well wiring 23,000.00 - - - - 0.0% 23,000.00 1.26 Supply, install & wire Pumps/Mixer Control Panel 60,200.00 - 37,200.00 - 37,200.00 61.8% 23,000.00 1.27 Power wiring 23,000.00 - - - - 0.0% 23,000.00 1.28 Lighting 17,000.00 - - - - 0.0% 17,000.00 1.29 Startup and testing 5,400.00 - - - - 0.0% 5,400.00 1.30 Vibration Analysis and report 3,000.00 - - - - 0.0% 3,000.00 Total Contract 880,000.00 - 202,600.00 - 202,600.00 23.0% 677,400.00 WORK COMPLETED
File revisions (1)
- Oct 10, 2026
8cb442c6fa481,679,573 bytes