Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 13, 2026

2995-26 2026 Multi Purpose Bond Ordinance - West Orange.pdf

Preserved file SHA-25637245b9e1166c1b39ec66730da775fb9e68edc72bf9bd4a325424053c57dcc54

Indexed text · page 3

Show all pages
Page 3

Description Appropriation Authorization Down Payment Useful Life (i) Preparation of assessment reports to be submitted to the New Jersey Department of Environmental Protection (“NJDEP”) in order to stay in compliance with the Municipal Separate Storm Sewer System (“MS4”) guidlelines under the Federal Clean Water Act; $ 160,000 $ 152,000 $8,000 5 years (ii) Installation of monitoring wells and sampling and testing at the Fire Department Headquarters in order to be in compliance with NJDEP environmental regualtions; $ 260,000 $ 247,000 $13,000 5 years (iii) Phase I mapping, including, but not limited to, sanitary sewer assets, condition assessment, closed-circuit television inspection and data collection of Basin A, which consists of gravity sewers, interceptor sewers, manholes, various sewage pump stations and force mains; $ 1,000,000 $ 950,000 $50,000 5 years (iv) Condition assessment, closed-circuit television inspection and data collection of Township-wide existing storm sewers to assess existing infrastructure and put together a plan for the future capital improvements to avoid emergency repairs; $ 450,000 $ 427,500 $22,500 5 years (v) Stormwater Utility Feasibility Study to determine if establishing a stormwater utility is prudent for the Township to manage runoff, flooding and aging infrastructure; $ 150,000 $ 142,500 $7,500 5 years (vi) Township-wide roadway condition survey consisting of core sampling to develop a 5 year replacement plan ranked by pavement condition; $ 35,000 $ 33,250 $1,750 5 years (vii) Final design of the Safe Routes to School – Design Assistance Program to the following schools, including, but not limited to, Redwood School, Kelly School, Gregory School, Roosevelt School and Hazel School and providing for various improvements consisting of, as applicable, ADA compliant curb ramps, LED pedestrian push buttons and regulatory and warning signs; $ 272,179 (including the $272,179 DOT Safe Schools Grant) $ 0 $ 0 (viii) Phase I improvements and repairs to the entire lengths or portions of, as applicable, Maple Avenue, Korwel Circle, Korwel Court, Glenview Drive, Beacon Place, $ 1,200,000 $ 1,140,000 $60,000 10 years

File revisions (1)