Supporting Documentation · Oct 13, 2026
2995-26 2026 Multi Purpose Bond Ordinance - West Orange.pdf
37245b9e1166c1b39ec66730da775fb9e68edc72bf9bd4a325424053c57dcc54Indexed text · page 5
Show all pagesDescription Appropriation Authorization Down Payment Useful Life (xvii) Replacement of the Vincent Pond walkway with a permanent stone walkway per NJDEP; $ 100,000 $ 95,000 $ 5,000 10 years (xviii) Replacement of the existing concrete panels on top of a culvert that runs underneath Luddington Road to address erosion; $ 225,000 $ 213,750 $ 11,250 20 years (xix) Installation of EV charging stations and ADA compliant parking spaces at the West Orange Public Library; and $ 690,825 (including the $390,000 NJ Clean Fleet Grant) $ 300,825 $0 10 years (xx) Section 20 Costs. $ 384,000 $ 365,500 $ 18,500 TOTALS: $10,318,504 $ 8,201,086 $ 346,250 (b) The improvements and purposes set forth in Section 3(a) above shall also include, as applicable, all engineering and design work, surveying, construction management services, construction planning, preparation of plans and specifications, permits, bid documents, construction inspection and contract administration, environmental testing and remediation, and all work, materials, equipment, labor and appurtenances necessary therefor or incidental thereto. (c) The estimated maximum amount of bonds or notes to be issued by the Township for said improvements and purposes is $8,201,086. (d) The estimated cost of said improvements and purposes to the Township is $10,318,504, the excess amount thereof over the estimated maximum amount of bonds or notes to be issued therefor are the Down Payments in the amount of $346,250 now available for said improvements and purposes from the Township’s Capital Improvement Fund and the Grants.
File revisions (1)
- Oct 10, 2026
37245b9e116651,922 bytes