• • • • • Traffic Control and Staging Plans Traffic Striping and Signing Plans Electrical Plans Landscape Plans Construction Details The Preliminary Roadway Plans will provide the basis for preparation of the Construction Cost Estimate and development of the Final Design scope. Activity 3085 – Prepare Preliminary Drainage Design M&S will prepare a preliminary drainage design to accommodate the proposed improvements while generally maintaining existing drainage patterns. The design will evaluate impacts to existing drainage facilities and identify localized modifications, which may include adjustment or relocation of inlets, modification of inlet types, short storm sewer extensions or replacements, and adjustment of structure elevations. Proposed grading will be coordinated with drainage and ADA requirements. Based on the anticipated improvements, the project is assumed not to constitute a Major Development under the NJDEP Stormwater Management Rules. Applicable NJDEP MS4 requirements will be incorporated into the design, including approved storm drain inlet protection measures where required. Evaluation of the existing storm drainage system for hydraulic capacity, existing flooding conditions, or existing drainage deficiencies is not included. Activity 3090 – Determine Traffic Engineering Facility Locations M&S will evaluate the existing traffic control devices, pedestrian facilities, signing, pavement markings, traffic signals, roadway lighting, and pedestrian crossing treatments throughout the project corridor to determine the preliminary locations and conceptual design of proposed traffic engineering improvements. Traffic engineering services will include collection of existing traffic data, traffic operational analyses, and conceptual design of pedestrian safety improvements. Traffic counts will be collected to support evaluation of pedestrian crossing treatments, RRFB warrants, signal timing refinements, and overall corridor operations. Data collection will occur as follows: ATR counts will be recorded for a continuous 24-hour period for 7 days in both travel directions, on a non-holiday week during the school year. ATRs will collect volume, speed and vehicle classification data, provided in 15-minute increments. ATR counts will be collected at the following nine (9) locations: • • • Pleasant Valley Way at Greenwood Avenue (3 Legs) Pleasant Valley

Page 10

vehicle classification data, provided in 15-minute increments. ATR counts will be collected at the following nine (9) locations: • • • Pleasant Valley Way at Greenwood Avenue (3 Legs) Pleasant Valley Way at Marmon Terrace (4 Legs) Pleasant Valley Way at Eagle Rock Avenue (2 legs – Eagle Rock Avenue) Intersection turning movement counts (TMCs) will be collected during one weekday (Tuesday, Wednesday or Thursday) and Saturday while school is in session in the Spring or Fall when local traffic generators have the most foot traffic. Data will be collected using MioVision count units. Vehicle and pedestrian data will be processed for the Weekday AM, Midday, PM, and Saturday peak periods. TMC counts will occur at the following locations: • • • Pleasant Valley Way at Greenwood Avenue Pleasant Valley Way at Marmon Terrace Pleasant Valley Way at Eagle Rock Avenue 7

File revisions (1)