Proposal, Cultural Resources Township of West Orange Pleasantdale Streetscape Improvements August 20, 2026 Page 3 Intensive-level Historic Architectural Survey The Intensive-level historic architectural survey will determine if previously identified cultural resources and any unidentified significant buildings, historic districts, and structures of greater than 50 years in age are present within the APE-Architecture and will be impacted by the project. Preliminary background research suggests there are approximately 11 previously unidentified and/or unevaluated historic resources within a probable APE-Architecture, consisting primarily of early to mid-twentieth century dwellings and commercial properties. These resources include Block 176.05, Lot 10; Block 176.03, Lots 16 and 17; Block 152.22, Lots 142.01, 142.02, 142.03, and 142.05; Block 154.06, Lots 13, 14, 15, and 18. RGA does not anticipate that all 11 resources will require Intensive-level survey. Important considerations will be if the architectural resource possesses the requisite historical significance and integrity for listing in the NRHP and whether the proposed undertaking has the potential to impact the resource’s ability to meet the NRHP Criteria. Project effects will be assessed on all identified historic properties. Estimated duration: 3 months. Prepare CR Survey Report (3310) RGA will prepare a Cultural Resources Survey Report covering historic architecture. The report will describe the survey and identification/evaluation of resources associated with the project and will follow current guidelines prepared by the NJDOT and the NJHPO. The report will summarize the results of Activity 3305 and will provide the basis for consultation with the NJHPO. Estimated duration: 2 months from completion of all fieldwork. Review CR Survey Report (3315) To be completed by the NJDOT. Estimated duration: 2 weeks. Address NJDOT Comments on CR Survey Report (3320) RGA will incorporate comments received from the NJDOT into a final Cultural Resources Survey report to be submitted to the NJHPO. Estimated duration: 2 weeks. Approve CR Survey Report (3325) To be completed by the NJDOT. Estimated duration: To be determined based on report complexity. ASSUMPTIONS/EXCLUSIONS This proposal assumes that the contractor and/or NJDOT will facilitate entry onto private properties, if necessary, to enable the completion of

Page 26

mined based on report complexity. ASSUMPTIONS/EXCLUSIONS This proposal assumes that the contractor and/or NJDOT will facilitate entry onto private properties, if necessary, to enable the completion of the Section 106 initiation letter and fieldwork.

File revisions (1)