Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 27, 2026

292-26 PE Proposal - West Orange TAP 2025 Rev1.pdf

Preserved file SHA-256123fd7b84af07daec629295c9cc99cb18d816b1d26e78e69f670188f2b23e404

Indexed text · page 27

Show all pages
Page 27

Proposal, Cultural Resources Township of West Orange Pleasantdale Streetscape Improvements August 20, 2026 Page 4 Survey tasks can only commence once mapping depicting the LOD is provided. RGA assumes that the project team will additionally provide the LOD as a GIS shapefile or CAD layer file. In the event project plans change after RGA has commenced survey tasks, a supplemental scope will be necessary. Phase IA/IB archaeological survey (i.e., shovel test pits, artifact processing and analysis) is not included. Such work, if required by the NJHPO, will require the submission of supplemental scope of work and cost. As the work does not extend within the boundaries of an NJR-listed historic property, RGA assumes that compliance with the New Jersey Register of Historic Places Act (NJRHPA) and the completion of an Application for Project Authorization (APA) will not be required for this project. Should the NJHPO require the drafting of an APA, a separate scope and cost can be provided for this task. Road and/or shoulder closure permits are not anticipated and not included in this scope. Assistance with drafting an MOA and/or Section 4(f) document (Activity Codes 3335 and 3410) and with the preparation and submission of Adverse Effect Documentation to the FHWA and Advisory Council on Historic Preservation (Activity Code 3350) is not included and would require a supplemental scope. Consultation with Native American tribes and other consulting parties will be performed by the NJDOT-BEPR. Should the NJHPO require intensive-level survey of additional historic resources, then a supplemental scope and cost would be needed. Mitigation work, if required, will take place during the Final Design (FD) phase. Archaeological monitoring, if required, would take place during the Construction (CON) phase.

File revisions (1)