Supporting Documentation · Nov 10, 2026
298-26 Agreement - Llewellyn Park Committee of Managers - Edits.doc.pdf
d6f8d8b06a65fa779d821f870b4a3adaf9d318541721dfe0eac40925174bb62bIndexed text · page 3
Show all pagesmile x 9 miles. Due to the special nature and circumstances of conditions in the Park, the Township shall directly provide certain services to the Park rather than reimbursing the Committee for such services. The Township shall directly provide obstructions removal services in the Park, as well as certain supplies, as follows and without charge: I. Salt for the roads with the Township's cost of salt provided to the Park to be subtracted from and offset against the Township's reimbursement to the Committee for snow/ice removal. The salt shall be stored at the Township’s salt storage depot at 25 Lakeside Avenue and all costs associated with transporting the salt from that depot to the Park shall be at the Park's expense. The Park shall also be responsible for all costs associated with spreading the salt on its roads. II. Bituminous concrete not to exceed fifty (50) tons per calendar year and, if the Park receives less than fifty (50) tons in any given year, the value of the difference shall be applied to and offset salt costs for that year, as noted in I above. The Park shall use the Township's contracted vendor as a supplier of bituminous concrete and all costs associated with transporting the material from the vendor to the Park and all costs associated with placing the material shall be at the Park’s expense. III. Removal of dead/hazardous trees up to fifteen (15) per calendar year to minimize obstruction call backs and pruning of protruding dead/hazardous tree limbs along Park roads also to minimize obstruction call backs. IV. Removal of other obstructions (fallen tree limbs, large stones, dead animals, and other objects or substances) which may impede passage along the roads, with the Township's Public Works Department, or Health Department, depending on the nature of the obstruction, to be called to effectuate the removal. Other obstructions do not include repair of potholes or other roadway damage which remains the responsibility of the Committee and does not include normal street cleaning. V. Removal of storm sewer obstructions excluding structural breaks to Park storm sewer mains. VI. Removal of sanitary sewer obstructions excluding structural breaks to Park sanitary sewer mains. E. The Township shall make the reimbursement payments required herein to the Committee on or before March 31st of each year subsequent to the reimbursed services having been
Park sanitary sewer mains. E. The Township shall make the reimbursement payments required herein to the Committee on or before March 31st of each year subsequent to the reimbursed services having been performed. Deleted: 8.6
File revisions (1)
- Nov 7, 2026
d6f8d8b06a65184,027 bytes