Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 10, 2026

3007-26 Bond Ord. (Revised) - 2026 Various Capital Acquisitions and Improvements.pdf

Preserved file SHA-25689ab334dd62d560c7f57d07a38f046464bc065cc8b0e29509a0c30c4e55c75b1

Indexed text · page 3

Show all pages
Page 3

3 #96344616.2 168182.014 Description Appropriation Authorization Down Payment Useful Life Chestnut Street to the Montclair border, Watchung Avenue from Washington Street to Ridge Avenue and Condit Lane from Watchung Avenue to terminus; all such improvements include, but are not limited to, as applicable, milling, paving, minor drainage and curb ramp replacement; CDBG Grant) (ii) Improvements and repairs to the entire lengths or portions of, as applicable, Winfield Street, Virginia Avenue, Kirk Street and Grant Terrace within the Township, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps and driveway aprons; and $ 1,700,000 (including the $392,489 DOT Road Grant $ 1,307,511 $ 0 10 years (iii) Acquisition and installation, as applicable, of EV charging stations and ADA compliant parking spaces at the West Orange Public Library. $ 690,825 (including the $390,000 NJ Clean Fleet Grant) $ 300,825 $ 0 10 years (iv) Section 20 Costs. $ 240,000 $ 228,000 $12,000 TOTALS: $ 3,230,825 $ 2,121,336 $27,000 (b) The improvements and purposes set forth in Section 3(a) above shall also include, as applicable, all engineering and design work, surveying, construction management services, construction planning, preparation of plans and specifications, permits, bid documents, construction inspection and contract administration, environmental testing and remediation, and all work, materials, equipment, labor and appurtenances necessary therefor or incidental thereto. (c) The estimated maximum amount of bonds or notes to be issued by the Township for said improvements and purposes is $2,121,336.

File revisions (1)