Packet · Jun 26, 2012
Conference/Public Meeting Agendas/Documents — Packet
9f4fc6df8009e9aa90d503fac6f721e290174a48c6b1a065ccfdab902cba1bc1Indexed text · page 223
Show all pagesDRAFT PROPOSED REVISIONS – OCTOBER 2011 Board having the proper jurisdiction. Any one (1) or two (2) family dwellings located in a residential district which do not require any bulk variances shall be exempt. Comment [PG91]: clarified intent 54. Prior to the issuance of Building Permits for any application approved by the Planning Board or Zoning Board of Adjustment, the applicant shall submit eight (8) copies of plans (site plans and architectural plans including floor plans and elevations) to the Planning Director to be signed by the Township Engineer, the Board Chairman and the Board Secretary. Signed plans in accordance herewith are required before any construction or other permits may be issued. 65. If any construction takes place that deviates from the plans or resolution of approval by the Planning Board and/or Zoning Board of Adjustment, the approval shall be deemed null and void. 76. If the approval is deemed null and void, all construction must stop. 87. Prior to the issuance of any construction or building permits, all required governmental permits and approvals must be obtained and copies provided to the Director of Planning and Municipal Engineer. b. Certificate of Occupancy Permit.* 1. Upon the completion in compliance with all the provisions of this chapter of any building or structure or alteration or enlargement thereto, upon the putting into use of any premises, lot or land where no building or structure is involved, or upon any change in tenancy for any nonresidential structure or lot, the owner or agent shall apply to the Construction Official and Zoning Officer in writing, for the issuance of a Certificate of Occupancy or use, pursuant to the provisions of this section. The Certificate, when issued by the Construction Official and Zoning Officer, shall show that the building or structure, premises, lot or land or part thereof and the proposed use are in conformity with the provisions of this chapter and of all other applicable ordinances. It shall be the duty of the Construction Official and Zoning
the proposed use are in conformity with the provisions of this chapter and of all other applicable ordinances. It shall be the duty of the Construction Official and Zoning Officer to issue a Certificate of Occupancy or use within ten (10) days after a written request for the same shall be filed in his/her office by the owner or agent, after having determined that the building or structure, premises, lot or land and the proposed use conform with this chapter and all other applicable ordinances. 2. No Certificate of Occupancy shall be issued unless the Township Engineer shall certify, where applicable, that all construction improvements have been installed pursuant to the plans as filed with the Construction Official and Zoning Officer. 3. A Certificate of Occupancy or Use shall be similarly applied for in the name of the owner, in the case of any building, structure, or premises, lot or land proposed to be put into use pursuant to any variance of the provisions of this chapter granted by the Board of Adjustment or by the Planning Board. Such certificate, when issued by the Construction Official and Zoning Officer, shall include a detailed description of the variance. 4. Upon written application of the owner or agent, the Construction Official shall issue a Certificate of Occupancy or use for any building or structure, premises, lot or land existing and in use on the effective date of this chapter, provided that he shall find that the use of such building or structure, premises, lot or land is in conformity with the provisions of this chapter and of all other applicable ordinances. 5. Upon written application, the Construction Official is empowered to issue limited and conditional Certificates of Occupancy for nonconforming buildings or structures accessory and incident to building construction or public works projects or to the holding of public, Editor's Note: See also Certificate of Occupancy for Central Business District, subsection 25-24.3. * 206
File revisions (1)
- Sep 29, 2026
9f4fc6df80092,270,115 bytes