Packet · Sep 11, 2012
Conference/Public Meeting Agendas/Documents — Packet
9c4cd6a7170e9fb1427eb848720445b7758bf8ad93c12ece6284373371eaf069Indexed text
by a licensed Professional Engineer. The Board may waive the provision of such reports at its discretion. 25-51.11 Appeal and Interpretation Requirements. No request made for an appeal or interpretations under the provisions of this chapter shall be considered complete until it complies with subsection 25-51.2 as well as the following requirements: a. A map prepared by the applicant or a professional architect, engineer, planner or surveyor which clarifies, in sufficient detail, the nature of the appeal or interpretation. b. Any documentation, form(s) or correspondence which explains the nature of the appeal or interpretation. c. A graphic or written description of the area surrounding the subject property. d. A statement or legal brief which clarifies the position of the applicant. (Ord. No. 904-88 § 25-8.6K) 211
25-51.12 Conceptual Stage Requirements. No conceptual stage application shall be considered complete unless it fully conforms with subsection 25-51.2 as well as the following requirements: a. A map, signed and sealed by a professional architect, engineer, planner or surveyor which contains the following: 1. Limits of the property involved and the scope of the subject proposal. 2. North arrow, scale, key map and title block. 3. General indication of the topographic conditions and any other environmental constraints. 4. Zoning district requirements. b. A statement describing the proposed project, its scope, size value as to the community and other pertinent details. c. A graphic or written description of the area surrounding the subject property. d. A description of other alternatives that have been considered or might be available. e. A listing of anticipated variance and waiver requests connected with the proposal. (Ord. No. 904-88 § 25-8.6L) 25-51.13 Filing Procedures. All applications for development which are within the jurisdiction of the Planning or Zoning Board, as conferred by N.J.S.A. 40:55-1 et seq., and this chapter, shall be filed with the applicable board secretary. The applicant shall obtain all necessary forms from the Secretary of the Planning Board or Zoning Board. Applicants shall file at least that number of copies of the application and submit the required fees as prescribed by the rules and regulations of the applicable board. Applicants shall file all other plans, maps, sketches or other documents as prescribed by the rules and regulations of the applicable board. Additionally, for any application involving any property located in the Central Business District (CBD) Main Street/Valley Road Corridor Zoning overlay indicated on the Official Zoning Map of the Township, the Planning or Zoning Board Secretary shall distribute a copy of such application, along with all drawings and exhibits, to the Special Improvement District (SID) Manager at the time of all regular distributions. All applications shall be filed at least three (3) weeks before the meeting at which the applicant wishes to be heard. (Ord. No. 904-88 § 25-8.6M; Ord. No. 1820-02 § 2) 25-51.14 Environmental Commission Review. Whenever the Environmental Commission shall have prepared and
at which the applicant wishes to be heard. (Ord. No. 904-88 § 25-8.6M; Ord. No. 1820-02 § 2) 25-51.14 Environmental Commission Review. Whenever the Environmental Commission shall have prepared and filed with the Planning Board an index of the natural resources of the Township, the Planning or Zoning Board shall make available to the environmental commission an informational copy of every application for development received by the Planning Board or Zoning Board. Failure of the Board to provide such copy shall not constitute grounds for invalidating any hearing or decision. (Ord. No. 904-88 § 25- 8.6N) 25-51.15 Technical Advisory Committee. a. Establishment. There is hereby established a Technical Advisory Committee to assist the Planning Board, the Zoning Board of Adjustment and applicants. This Committee shall be comprised of: 1. Director of Planning 2. Township Engineer 212
3. Director of the Fire Department 4. A Class IV member of the Planning Board who shall hold no other municipal office, appointed by the Planning Board Chairman. b. Initial Review. All applications for development submitted to the Secretary of the Planning Board or the Secretary of the Zoning Board of Adjustment shall be forthwith reviewed by the Director of Planning. Within seven (7) days of the receipt of any application for development, the Director of Planning shall either issue a certificate that such application is complete or issue a statement of the missing items. The respective Board Secretary shall forthwith transmit either the certificate or the statement to the applicant forthwith. c. Committee Review. The Technical Advisory Committee shall review all applications where any proposed renovations to the existing commercial and/or retail space exceed one hundred thousand ($100,000.00) dollars in cost; or a change in the existing permitted use is proposed. If the applicant agrees with the conditions and revisions recommended by the Technical Advisory Committee, then the full Planning Board or Zoning Board of Adjustment without a full hearing may vote in favor of the application and a memorializing Resolution with these recommendations. The Technical Advisory Committee shall also review every complete application for development. The applicant shall be notified, in writing not less than seven (7) days nor more than fourteen (14) days before, of the date on which the application shall be reviewed by the committee. The applicant shall be invited to attend, either alone or accompanied by an attorney, architect, engineer and any other experts the applicant chooses. The Committee shall issue its recommendations on every application, in writing. These recommendations shall be filed with the secretary of the proper board and a copy shall be mailed to the applicant. If the applicant does not agree with the conditions recommended by the Technical Advisory Committee, the Planning Board or Zoning Board of Adjustment shall hear the application as it would any other application. d. Time for Decisions. Referral of an application to the Technical Advisory Committee shall not extend the time in which the
hall hear the application as it would any other application. d. Time for Decisions. Referral of an application to the Technical Advisory Committee shall not extend the time in which the Planning Board or Board of Adjustment may act upon such application. (Ord. No. 904-88 § 25-8.6O; New; Ord. No. 2100-06 § II) 25-52 - 25-54 RESERVED. 25-55 ESCROW DEPOSITS FOR APPLICATIONS. The Planning Board and/or Zoning Board of Adjustment shall require fees and escrow deposits in accordance with the provisions of this chapter. Such funds shall be utilized to pay the cost of professional fees, including for engineering, legal, planning and/or traffic experts, and certified shorthand reporting fees incurred for review of and/or testimony concerning an application for development submitted by an applicant. (Ord. No. 904-88 § 25-87) 25-55.1 Escrow Schedule. a. Subject to the provisions of paragraph b. hereof, each applicant shall prior to the application being ruled complete pursuant to the provisions of the Municipal Land Use Law, submit the following sum(s) to be held in escrow in accordance with the provisions hereof: 1. Residential and Nonresidential Dwelling Units or Lots 3–25 $ 3,000.00 26–100 3,500.00 213
101–500 5,500.00 501–1000 8,000.00 1000 + 10,000.00 2. Commercial/Industrial 1,250–2,500 square feet gross floor area $1,500.00 2,501–20,000 square feet gross floor area 2,500.00 20,000–50,000 square feet gross floor area 5,500.00 Over 50,000 square feet gross floor area $.05 each additional square feet 3. Preparation of Resolution of Approval or Denial: up to $750. When deemed necessary the Planning/Zoning Board may require an escrow for minor development matters. b. Within thirty (30) days after the filing of an application for development the Planning Board and/or Zoning Board of Adjustment as the case may be, shall, in conjunction with appropriate representative of the staff of the Township, review the application for development to determine whether the escrow amount set forth in paragraph a. above is adequate. In conducting such review the Board shall consider the following criteria. 1. The presence or absence of public water and/or sewer servicing the site. 2. Environmental considerations, including but not limited to geological, hydrological and ecological factors. 3. Traffic impact of the proposed development. 4. Impact of the proposed development on existing aquifer and/or water quality. Upon completion of the review and within the thirty (30) day period the Board shall adopt a Resolution specifying whether the escrow amount specified in paragraph a. is sufficient, excessive or insufficient. In the event the Board shall determine that the amount is excessive it shall in the Resolution specify the amount that shall be deemed sufficient. In the event the Board shall determine the amount specified in paragraph a. is insufficient it shall so specify and shall further set forth the amount required to be posted in light of the criteria specified herein. c. This paragraph adopts and creates a payment schedule for consultants and/or employees for special Planning Board or Zoning Board meetings paid out of escrow funds paid by the applicant who is heard at said special Planning or Zoning Board Meeting.
consultants and/or employees for special Planning Board or Zoning Board meetings paid out of escrow funds paid by the applicant who is heard at said special Planning or Zoning Board Meeting. The schedule is as follows: 1. Schedule. (a) Attendance/all meeting preparation, post-meeting duties/minutes for Secretary: $225.00 (b) Attendance for Public Advocate: $250.00 (c) Attendance of transcriber: $225.00 (d) Attendance of Board Attorney: $500.00 (e) Attendance of Planner: $500.00 (f) All other expenses such as newspaper notices: $60.00 (g) The Board also has the right to hire other consultants if deemed necessary by the Board for regular or special meetings such as traffic or environmental consultants. 214
If the Board deems additional work is needed that is not part of the preparation, meeting and post duties an hourly rate will be paid. The following is the hourly rate: Secretary— $33.82/hr; transcriber—$50.00/ hr.; any other professionals— $125.00/hr. 2. A ten (10) day written notice with a breakdown of the expenses shall be given to the applicant before funds are removed. (Ord. No. 904-88 § 25-8.7A; Ord. No. 1970-04 §§ 1, 2) 25-55.2 Posting of Escrow Funds. No major application for development shall be deemed complete until such time as the applicant shall have posted with the Township in cash or certified check the amount of escrow deposit determined by the Planning Board and/or Board of Adjustment to be required in accordance with the provisions of this chapter. All such escrow funds shall be utilized by the appropriate Board to pay the cost of professional services, including certified shorthand reporting fees, incurred by the Board for review and/or testimony in connection with the particular application for development. All sums not actually so expended shall be refunded to the applicant within thirty (30) days after the final determination by the appropriate Board with respect to such application. (Ord. No. 904-88 § 25-8.7B) 25-55.3 Deposit of Escrow Fund - Interest Bearing Account. The Township shall deposit all funds pending completion and review of the development application. The money shall be placed in an interest bearing account. In the event that a refund is to be made to the applicant, the municipality shall refund with pro rated interest the amount within thirty (30) days from the date of final approval. (Ord. No. 904-88 § 25-8.7C) 25-56 APPLICATION FEES. 25-56.1 Minor Subdivision Application Fees. Fee Escrow a. Resubdivision where no $50.00 N/A new lots are created b. Other Base fee $100.00 N/A Plus per lot fee 25.00 (Ord. No. 904-88 § 25-8.8) 25-56.2 Major Subdivision Application Fees. a. Sketch/Plat Concept Application Base fee $100.00 N/A Plus per lot fee 25.00 b. Preliminary Application Base fee $200.00 (1) Plus
pt Application Base fee $100.00 N/A Plus per lot fee 25.00 b. Preliminary Application Base fee $200.00 (1) Plus per lot fee 50.00 215
c. Final Application Base fee $250.00 (1) Plus per lot fee 25.00 (Ord. No. 904-88 § 25-8.9) 25-56.3 Site Plans - Nonresidential Application Fees. a. Sketch Plat/Conceptual Fee $350.00 N/A b. Preliminary Application Base fee (minimum) $300.00 (1) Plus floor area fee .02/sq. ft. Plus parking space fee .50/space Plus acreage fee $50.00/acre The preliminary fee shall be calculated by adding to the base fee one (1) of the three (3) remaining sub-fees. The total fee shall represent the maximum fee possible. c. Final Application 1/2 of (1) preliminary fee (Ord. No. 904-88 § 25-8.10; Ord. No. 1304-94) 25-56.4 Site Plans - Residential Application Fees. a. Sketch Plat Fee $75.00 N/A b. Preliminary Application Base fee $200.00 (1) Plus unit fee 50.00 c. Final Application Base fee $100.00 (1) Plus unit fee 25.00 (Ord. No. 904-88 § 25-8.11) 25-56.5 Variances and Conditional Use Application Fees. a. “D” Variances Nonresidential $350.00 (1) Residential 1–2 family (owner occupied) $ 75.00 1–2 family (non- owner occupied) 125.00 Other 150.00 Public/Quasi public 100.00 216
File revisions (1)
- Sep 29, 2026
9c4cd6a7170e3,256,399 bytes