Packet · Sep 11, 2012
Conference/Public Meeting Agendas/Documents — Packet
9c4cd6a7170e9fb1427eb848720445b7758bf8ad93c12ece6284373371eaf069Indexed text · page 224
Show all pages25-51.8 Conditional Use Requirements. No conditional use application shall be considered complete unless it fully conforms with subsections 25-51.2 and 25-51.6 as well as the following requirements: a. A notation indicating the section of this chapter that allows the conditional use as proposed. b. A listing of the conditional use standards that apply to the subject proposal. 25-51.9 "C" Variance Requirements. No "c" or bulk variance application shall be considered complete unless it fully conforms with subsection 25-51.2 as well as the following requirements: a. A map, either in conformance with subsections 25-51.3, 25-51.4, 25-51.5 and 25-51.6 or if the application is to be bifurcated, a separate map, signed and sealed by an architect, engineer, planner or surveyor which provides sufficient data (i.e., setbacks, lot area, existing and proposed structures, etc.) upon which a decision can be based. b. A statement or legal brief which clarifies why the "c" variance should be granted. Particular attention should be paid to the contents of N.J.S.A. 40:55D-70c, applicable case law and relevant Township Ordinances and N.J. Statutes. (Ord. No. 904-88 § 25-8.6I) 25-51.10 "D" Variance Requirements. No "d" or use variance application shall be considered complete unless it fully conforms with subsection 25-51.2 as well as the following requirements: a. A map, either in conformance with subsection 25-51.3, 25-51.4, 25-51.5 or 25-51.6 or if the application is to be bifurcated, a separate map, signed and sealed by an architect, engineer, planner or surveyor which provides sufficient data (i.e. setbacks, lot area, existing and proposed structures, etc.) upon which a decision can be based. b. A statement or legal brief which clarifies why the "d" variance should be granted and the "special reasons" that pertain to the subject proposal. Particular attention should be paid to the contents of N.J.S.A. 40:55D-70d, applicable case law and relevant Township Ordinances and N.J. Statutes. c. A planning report prepared by a licensed Professional Planner and a traffic report prepared by a licensed Professional Engineer. The Board may waive the provision of such reports at its discretion. 25-51.11 Appeal and Interpretation Requirements. No request made for an appeal
by a licensed Professional Engineer. The Board may waive the provision of such reports at its discretion. 25-51.11 Appeal and Interpretation Requirements. No request made for an appeal or interpretations under the provisions of this chapter shall be considered complete until it complies with subsection 25-51.2 as well as the following requirements: a. A map prepared by the applicant or a professional architect, engineer, planner or surveyor which clarifies, in sufficient detail, the nature of the appeal or interpretation. b. Any documentation, form(s) or correspondence which explains the nature of the appeal or interpretation. c. A graphic or written description of the area surrounding the subject property. d. A statement or legal brief which clarifies the position of the applicant. (Ord. No. 904-88 § 25-8.6K) 211
File revisions (1)
- Sep 29, 2026
9c4cd6a7170e3,256,399 bytes