Town CrierWest Orange, New Jersey
← Back to search

Packet · Sep 11, 2012

Conference/Public Meeting Agendas/Documents — Packet

Preserved file SHA-2569c4cd6a7170e9fb1427eb848720445b7758bf8ad93c12ece6284373371eaf069

Indexed text · page 195

Show all pages
Page 195

25-40 ADMINISTRATIVE PROVISIONS. 25-40.1 Application of Regulations. All buildings or structures hereafter used, constructed, altered, enlarged or rebuilt, and all lots or land shall hereafter be used in accordance with the regulations of this chapter. (Ord. No. 904-88 § 25-7.1) 25-40.2 Permits. a. Building Permits. 1. No building, structure or part thereof shall be erected, constructed, reconstructed, structurally altered or moved until there has been filed with the Construction Official a plan in duplicate, drawn to scale showing the actual dimensions, radii and angles of the lot to be built upon, the exact size and location of the main structure, building or buildings, together with accessory buildings, if any, supplemented by such other information as may be necessary to provide for the enforcement of this chapter, and to determine the proprietary of issuance of a Building Permit by the Construction Official, with a prior signoff of the Zoning Officer. 2. No Building Permit shall be issued for the erection, construction, reconstruction, alteration or moving of any building or structure or part thereof, unless the plans indicate that such building or structure or part thereof, is designed and intended to conform in all respects to the provisions of this chapter, and until either the Planning Board or Zoning Board, where applicable, have approved a site plan that conforms with the requirements of this chapter. However, in the case of a permitted single family house, Planning Board or Zoning Board approval is not required prior to the issuance of a Building Permit unless specific conditions have been placed on the property by the Township Council. 3. Prior to the issuance of a Building Permit or Certificate of Occupancy for any permitted or non-conforming use, the applicant shall apply for any required approvals from the Planning Board or Board of Adjustment, such as site plan or variance approval. 4. Prior to the issuance of Building Permits for any application approved by the Planning Board or Zoning

Page 195

d or Board of Adjustment, such as site plan or variance approval. 4. Prior to the issuance of Building Permits for any application approved by the Planning Board or Zoning Board of Adjustment, the applicant shall submit eight (8) copies of plans (site plans and architectural plans including floor plans and elevations) to the Planning Director to be signed by the Township Engineer, the Board Chairman and the Board Secretary. Signed plans in accordance herewith are required before any construction or other permits may be issued. 5. If any construction takes place that deviates from the plans or resolution of approval by the Planning Board and/or Zoning Board of Adjustment, the approval shall be deemed null and void. 6. If the approval is deemed null and void, all construction must stop. 7. Prior to the issuance of any construction or building permits, all required governmental permits and approvals must be obtained and copies provided to the Director of Planning and Municipal Engineer. b. Certificate of Occupancy Permit.* * Editor's Note: See also Certificate of Occupancy for Central Business District, subsection 25-24.3. 182

File revisions (1)