Town CrierWest Orange, New Jersey
← Back to search

Packet · Sep 11, 2012

Conference/Public Meeting Agendas/Documents — Packet

Preserved file SHA-2569c4cd6a7170e9fb1427eb848720445b7758bf8ad93c12ece6284373371eaf069

Indexed text · page 200

Show all pages
Page 200

alarm devises and carbon monoxide alarms shall be designed for and shall be capable of self- restoration or manual restoration to normal conditions for operation. No provisions shall be made for deactivation of the audible alarms other than by reactivation of the system. g. Responsibility of Owner. The owner of any structure shall be responsible for the maintenance and replacement of the smoke-sensitive alarm devise(s) and carbon monoxide alarm(s) required by this section. However, the tenant shall be responsible for the periodic testing of the smoke-sensitive alarm devise(s) and carbon monoxide alarm(s) to insure that they are operational during the term of such tenancy. In the event of any defective smoke-sensitive alarm devise or carbon monoxide alarm, the tenant shall notify the owner within twenty-four (24) hours. Each owner shall thereafter be responsible to repair or replace the defective smoke-sensitive alarm devise or carbon monoxide alarm within five (5) days of being notified that same is defective. Failure to correct the defective smoke-sensitive alarm devise or carbon monoxide alarm within five (5) days after notification shall constitute a violation of this section. 25-40.4 Completion of Existing Buildings. a. This chapter or any amendment thereto shall not affect any building or its designated use under the following series of conditions and circumstances: 1. Complete plans for the building legally filed prior to the adoption of the N.J. Uniform Building Code or any amendment thereto affecting such building or the use thereof. 2. Actual construction begun within ninety (90) days after the building permit was issued. 3. Structural framework completed within six (6) months after the Building Permit was issued. 4. Entire building completed according to the filed plans within two (2) years after the Building Permit was issued. b. If a projected building is situated in a district which is hereafter changed by amendment to the zoning map, the provisions of paragraph a. above shall apply to such building. (Ord. No. 904-88 § 25-7.3) 25-40.5 Enforcement. a. Enforcement Officer. The Construction Official is hereby designated the Enforcement Officer under this section. b. Compliance. The Construction Official shall withhold issuing a

Page 200

cement. a. Enforcement Officer. The Construction Official is hereby designated the Enforcement Officer under this section. b. Compliance. The Construction Official shall withhold issuing a Certificate of Occupancy for any project which is not in full compliance with this section as approved by the Township Engineer or his/her designated representative. c. Review. A determination to withhold the Certificate of Occupancy, under paragraph b. above shall be made after a review of the plans and specifications on file with the Construction Official and an on-site inspection by the Construction Official or his/her designated representative. d. Within the Division of Inspections in the Department of Planning and Development, there is created the office of Zoning Officer. The Planning Director shall have the ability to appoint and/or designate the party who shall fill the office of Zoning Officer. The person filling the office of Zoning Officer may also perform other duties such as Construction Official within the Division of Inspections. 1. Duties of the Zoning Officer. (a) It shall be the duty of the Zoning Officer to enforce the provisions of this chapter and Chapter XIV, and in no case, except under a written order of the Board of 187

File revisions (1)