Packet · Sep 11, 2012
Conference/Public Meeting Agendas/Documents — Packet
9c4cd6a7170e9fb1427eb848720445b7758bf8ad93c12ece6284373371eaf069Indexed text · page 230
Show all pagesb. “C” Variances Nonresidential $250.00 Residential 1–2 family (owner occupied) $ 75.00 1–2 family (non- owner occupied) 125.00 Other 250.00 Public/Quasi public 100.00 c. Interpretations and Appeals Fee $150.00 d. Conditional Uses Fee $300.00 Separate fee(s) shall be required for each application type. Therefore, if an application package consists of a “D” variance, “C” variance and site plan, the total fee shall be the sum of the fees for each separate application. The escrow charge shall be the maximum for any one type of application. Where disbursements from the escrow account leave less than ten (10%) percent of the original deposit, the applicant shall replenish the account in an amount equal to the original deposit.* (Ord. No. 904-88 § 25-8.12; Ord. No. 1305-94) 25-56.6 Fee for Digitizing Zoning Board of Adjustment and Planning Board Applications, Exhibits and Drawings. a. Residential Site Plan and Subdivision Fees. Concept Plan: 0–20 lots/units: $100.00 per lot or unit 21+lots/units: $2,000.00 + $50.00 per lot/unit in excess of 20 Minor Subdivision: $200.00 + $100.00 per lot Site and/or Major Subdivision: Preliminary: 0–10 units or lots: $500.00 + $100.00 per lot or unit 11–30 units or lots: $1,000.00 + $75.00 per lot or unit 31 or more units or $2,500.00 + $50.00 per lots: lot or unit Final: 0–10 units or lots: $200.00 + $75.00 per
r $2,500.00 + $50.00 per lots: lot or unit Final: 0–10 units or lots: $200.00 + $75.00 per lot or unit 11–30 units or lots: $300.00 + $50.00 per lot or unit 31 or more units or $1,000.00 + $40.00 per * Editor's Note: See escrow schedule (Section 25-55) Township Zoning Ordinance. If less than ten (10%) percent remains in escrow account, applicant shall post additional escrow in amounts equal to original deposit. 217
File revisions (1)
- Sep 29, 2026
9c4cd6a7170e3,256,399 bytes