Packet · Nov 25, 2024
Township Council Meeting — Packet
2e96ec8240f722ba48013393d4787a1405d283f925366b0f0b8e5ce974c17182Indexed text · page 109
Show all pages320-24 GRABOWSKI CONSTRUCTION, INC 770 Northfield Ave West Orange NJ 07052 Ph: 973-731-0111 Fax: 973-731-6709 Email - Grabowskiconst@gmail.com INVOICE Attention: Township of West Orange 25 Lakeside Avenue West Orange NJ Job Name: Storm Manhole Repair Location: Wellington Ave Date: 11/4/2024 Job #: 2024-1011 Prepared By: J. Lanza Tax Exempt: Yes Labor Open Shop Plans By: Plan Date: Revised: Sheets: Geotech Report By: Report Date: All pricing based on the current NJDOT fuel & asphalt indexs listed below. All pricing is subject to change and will be reevalutated at the time the work is performed. Any additional costs due to index escalation is excluded and will be passed on to the owner Index Date: Fuel Index: Asphalt Index: ********************************************************* All pricing listed in this estimate are based on labor, equipment & material costs at the time of the original estimate submission. Due to volatility of material costs and overal escalation,Grabowski Construction can only guaruntee pricing for 15 days Please see the note below the grand total price related to material cost escalation. Additionaly, unit prices may subject to change due to the following: -Changes in quantities -Changes to the overal scope of work -Phasing/Sequence of work changed ********************************************************* 01. Storm Manhole Repair Description Qty UOM U/P Ext. Price Saw cut pavement Removal & Disposal of pavement around Manhole Repair/Restore Deteriorated Manhole Replace Bricks & Re-grout Joints Patch Asphalt **Work done on a saturday** Notes: Storm Manhole Repair Job #: Subtotal - $7,200.00 Grand Total - $7,200.00
File revisions (1)
- Sep 29, 2026
2e96ec8240f711,827,543 bytes