Packet · Nov 25, 2024
Township Council Meeting — Packet
2e96ec8240f722ba48013393d4787a1405d283f925366b0f0b8e5ce974c17182Indexed text · page 15
Show all pagesThe project might also include retrofitting certain storm drain inlets along drains in the vicinity of the lake to meet standards outlined in the Stormwater Management rules. The retrofitting focuses on solids and floatable control to help reduce the amounts of pollutants that may enter the stormwater system that impact receiving waters. Crystal Lake is a spring-fed lake and the headwater to the Rahway River and a passive park facility that is underutilized by West Orange residents. According to FEMA’s Flood Insurance Rate Map (FIRM) Map # 34013C0111F with an effective date of June 4, 2007, Crystal Lake is within Zone A flood hazard area. Please see attached FIRM map and Stream Stat for drainage area to the Crystal Lake. ANTICIPATED EXPEDIATED PROJECT SCHEDULE Project Tasks Funding Recommendations Anticipated Start/Completion Dates October 2024 Develop and Issue RFP Mid-October 2024 Award Concept Phase/Design & Permitting Engineering Services NJDEP Pre-Application Meeting November 2024 NJDEP Permitting Submission Package Hudson-Essex-Passaic SCD Permit Execute Grant Agreement February 2025 to July 2025 Finalize Project Design & Specifications July 2025 Award Construction Contract August 2025 Construction Phase September 2025 to November 2025 Grant Closeout December 2025 December 2024-January 2025 January 2025 to June 2025 *The timetable above is tentative and based upon the anticipated date for execution of grant agreement and obtaining NJDEP permitting within 6 months of submitting permit application. The following professional services are required for the proposed recreational improvements: LAND SURVEYING SERVICES: A. Preparation of a Base Map utilizing aerial orthographic photographs with field data to supplement planimetric features such as tax map data to be provided by the Township in CAD for the preparation of Concept Plans; B. Boundary and Topographic Survey for OSPAC and Crystal Lake for the preparation 2 AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org
File revisions (1)
- Sep 29, 2026
2e96ec8240f711,827,543 bytes