Packet · Nov 25, 2024
Township Council Meeting — Packet
2e96ec8240f722ba48013393d4787a1405d283f925366b0f0b8e5ce974c17182Indexed text · page 169
Show all pagesof recordation provided by the recording office. However, if the initial proof provided to the municipality is not a copy of the complete recorded document, a copy of the complete recorded document shall be provided to the municipality within 180 calendar days of the authorization granted by the municipality. N. A stormwater management measure approved under the municipal stormwater management plan or ordinance may be altered or replaced with the approval of the municipality, if the municipality determines that the proposed alteration or replacement meets the design and performance standards pursuant to § 25-29.4 of this ordinance and provides the same level of stormwater management as the previously approved stormwater management measure that is being altered or replaced. If an alteration or replacement is approved, a revised deed notice shall be submitted to the municipality for approval and subsequently recorded with the } Essex County Register of Deeds and Mortgages, Hall of Records, 465 Martin Luther King Jr. Boulevard #130, Newark, N.J. 07102 and shall contain a description and location of the stormwater management measure, as well as reference to the maintenance plan, in accordance with M above. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality in accordance with M above. Deleted: Section IV Deleted: {insert appropriate Office of the County Clerk or the registrar of deeds and mortgages, as applies… Deleted: an O. Green Infrastructure Standards 1. This subsection specifies the types of green infrastructure BMPs that may be used to satisfy the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards. 2. To satisfy the groundwater recharge and stormwater runoff quality standards at § 25-29.4p, and q , the design engineer shall utilize green infrastructure BMPs identified in Table 1 at § 25-29.4f and/or an alternative stormwater management measure approved in accordance with The § 25-29.4g following green infrastructure BMPs are subject to the following maximum contributory drainage area limitations: Best Management Practice Deleted: Section IV.P and Q Deleted: Section IV.F. Deleted: Section IV.G. Deleted: e Maximum Contributory Drainage Area Dry Well 1 acre Manufactured Treatment Device Pervious Pavement Systems Small-scale
Section IV.P and Q Deleted: Section IV.F. Deleted: Section IV.G. Deleted: e Maximum Contributory Drainage Area Dry Well 1 acre Manufactured Treatment Device Pervious Pavement Systems Small-scale Bioretention Systems 2.5 acres Area of additional inflow cannot exceed three times the area occupied by the BMP 2.5 acres Small-scale Infiltration Basin 2.5 acres Small-scale Sand Filter 2.5 acres 3. To satisfy the stormwater runoff quantity standards at§ 25-29.4r , the design engineer shall utilize BMPs from Table 1 or from Table 2 and/or an alternative stormwater management measure approved in accordance with§ 25-29.4g . 15 Deleted: Section IV.R Deleted: Section IV.G
File revisions (1)
- Sep 29, 2026
2e96ec8240f711,827,543 bytes