Show all pageschannel or stream cleaning for government agencies (GP 25) will probably be needed for the construction of proposed improvements; The desired improvements are anticipated to be proposed within Crystal Lake a tributary to the Rahway River (classified as Category One water) and Flood Hazard Area and the 300 foot wide Riparian Zone extending from the top of bank of the stream. Prepare and submit NJDEP Flood Hazard Area (FHA) in accordance with the FHA Control Act Rules N.J.A.C. 7:13; Permit by Rules to facilitate the construction of the proposed improvements; Stormwater Management design and site drainage improvements to address major development requirements in accordance with N.J.A.C. 7:8. NJDEP Regulatory permit fees are to be provided by the Township at the time of the application. III. HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT (SCD) It is anticipated that Certification by the Hudson-Essex-Passaic SCD will be required due to the limits of disturbance. Consultant will prepare and submit the following items in support of the SCD application: SCD application form; Soil Erosion and Sediment Control Plans in accordance with “Standards” pursuant to N.J.S.A. 4:24-39 and N.J.A.C. 2:90-1.1; Engineering Drainage Report; Complete set of Constructions Plan; Revisions as requested from the SCD within the 60-day review & approval period; and Request for NJDEP Stormwater General Permit Authorization (RFA) to discharge stormwater from a construction site. The SCD certification, inspection, and administrative fee and RFA is to be provided by the Township at the time of the applications. IV. FINAL DESIGN OF CONSTRUCTION PLANS A. Final Design to incorporate permits and contract items; B. Preliminary Plans and Cost Estimate are to be submitted for final review and approval; C. Plan Set to include but not limited to Cover Sheet with location map, General and Construction Notes with legends, Existing Conditions/Survey Plan, Control Plan, Demolition Plan, Construction Plan, Grading Plan and Earthwork Summary, Utility Plan including profiles, Landscaping Plan, Soil Erosion and Sediment Control Plan and Details, Traffic Control and Detour Plans and Construction Details; D. Include four (4) meetings with the Township Officials for Kickoff, Preliminary Design, Public Presentation and Final Design; V. BID PHASE 4 AN EQUAL OPPORTUNITY
our Plans and Construction Details; D. Include four (4) meetings with the Township Officials for Kickoff, Preliminary Design, Public Presentation and Final Design; V. BID PHASE 4 AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org
File revisions (1)
- Sep 29, 2026
2e96ec8240f711,827,543 bytes