Packet · Nov 25, 2024
Township Council Meeting — Packet
2e96ec8240f722ba48013393d4787a1405d283f925366b0f0b8e5ce974c17182Indexed text · page 46
Show all pagesFig.1 Approximate Survey Area Topographic Survey Matrix will schedule on-site work with the project manager from your office who will work directly with facility management. Matrix will need full access to the property with parking available for their vehicles if convenient public parking is unavailable. Matrix will prepare a Base Map utilizing aerial orthographic photographs downloaded from an on-line source with field data to supplement planimetric features plus tax map parcel data to be provided by the Township in CAD for the preparation of Concept Plans; Matrix will provide a Boundary and Topographic for OSPAC and Crystal Lake for the preparation of permitting and construction plans; Matrix will at a minimum map the location of wetlands, buffers, riparian zones, limits of the 100Year Flood Hazard Area (FHA) and top of bank location as per Professional Wetlands Scientist and Engineer; Location of tree canopy around the lake will be established during survey field operations; 3
File revisions (1)
- Sep 29, 2026
2e96ec8240f711,827,543 bytes