Town CrierWest Orange, New Jersey
← Back to search

Packet · Nov 25, 2024

Township Council Meeting — Packet

Preserved file SHA-2562e96ec8240f722ba48013393d4787a1405d283f925366b0f0b8e5ce974c17182

Indexed text · page 53

Show all pages
Page 53

 Any pavement cores, temporary or permanent wells, test pits, or test strips, if and as warranted or required  County or local planning board submissions are excluded  Traffic engineering is excluded  Preparation of a Phase I Environmental Site Assessment (ESA) is excluded  Structural engineering shall be limited to light pole and shade structure foundations and calculations CLOSING Any item listed above which is not ordered will not be billed. Separate authorization from the client will be requested prior to commencing services outside the scope of this proposal. All out-of-pocket expenses including, but not limited to, application fees, laboratory testing costs, mylar copies, certified mailings, photographs, blueprints, and special deliveries are considered additional to the proposal items unless specifically noted within the scope of this proposal. This proposal is submitted solely and exclusively for the use of the Township of West Orange for consideration of the professional services of Matrix. Disclosure of this proposal’s content to any third party without prior written authorization from Matrix is expressly prohibited. In addition to the specific items as listed herein, the client may be required to demonstrate compliance with certain permit and approval conditions as may be imposed by one or more of the regulatory agencies. These conditions may require revisions to the plans and/or preparation of additional supporting documentation. This proposal does not include these additional items unless specifically outlined within the scope of this proposal. 10

File revisions (1)