Packet · Nov 25, 2024
Township Council Meeting — Packet
2e96ec8240f722ba48013393d4787a1405d283f925366b0f0b8e5ce974c17182Indexed text · page 77
Show all pagesMs. Zayibeth Carballo Township of West Orange Re: Professional Engineering Services Oskar Schindler Performing Arts Center and Crystal Lake Improvements October 24, 2024 Page 7 B. Prepare a Drainage Report; C. Prepare a Final Plan Set incorporating Township Comments to include but not be limited to the following: Cover Sheet with location map General and Construction Notes with legends Existing Conditions/Survey Plan Control Plan Demolition Plan Construction Plan Grading Plan and Earthwork Summary Utility Plan including profiles Landscaping Plan Soil Erosion and Sediment Control Plan and Details Traffic Control and Detour Plans and Construction Details D. Prepare Specifications; E. Prepare Final Engineer’s Estimate; and, F. Attend four (4) meetings with the Township Officials for Kickoff, Preliminary Design, Public Presentation and Final Design. 5. BID PHASE The work under this task will include the following: A. Provide 20 sets of plans and specifications; B. Respond to Request for Information (RFI) during the bid period; C. Issuance of Addenda(s) to the Qualified Purchasing Agent; D. Bidding documents (plans and specifications) deliverables to the Township via AutoCAD, hard copy and PDF files. S:\West Orange\Proposals\24-10-24 West Orange OSCPA and Crystal Lake.docx
File revisions (1)
- Sep 29, 2026
2e96ec8240f711,827,543 bytes