Show all pagesZayibeth Carballo-Township Engineer Township of West Orange October 25, 2024 OSPAC/Crystal Lake The following is offered: 1. Fishing Pier and Floating Dock It is anticipated that these will be pre-manufactured items chosen by the Township. This item will require NJDEP permitting, representation on the plans and construction details, and in the technical specifications. Additional construction administration will also be required in the form of shop drawings, inspections, and payment coordination. The work performed by GPI specifically is limited to the foundation design of the pier and/or dock. The structural design is to be performed by a professional engineer, licensed in the State of New Jersey, under the responsibilities of the pier and/or dock vendor. 2. Paddle Boat/Kayak Launch Area This item will require NJDEP permitting, representation on the plans and construction details, and in the technical specifications. Additional construction administration will also be required in the form of shop drawings, inspections, and payment coordination. The work performed by GPI specifically is limited to the foundation design of the paddle boat/kayak launch area. The structural design is to be performed by a professional engineer, licensed in the State of New Jersey, under the responsibilities of the paddle boat/kayak launch area vendor. 3. Prefabricated Pedestrian Bridge This item will require NJDEP permitting, representation on the plans and construction details, and in the technical specifications. Additional construction administration will also be required in the form of shop drawings, inspections, and payment coordination. The work performed by GPI is limited to the foundation design of the bridge. The structural design is to be performed by a professional engineer, licensed in the State of New Jersey, under the responsibilities of the bridge vendor. 4. Small Shoreline with Outdoor Shower This item will require NJDEP permitting, representation on the plans and construction details, and in the technical specifications. Additional construction administration will also be required in the form of shop drawings, inspections, and payment coordination. The work will assume that the showers are basically a shower head over a concrete pad that will drain to the surface. It is also assumed that water will be available from one of the existing structures and that
ill assume that the showers are basically a shower head over a concrete pad that will drain to the surface. It is also assumed that water will be available from one of the existing structures and that structure will have sufficient space and utility capacity for a water heater, if desired. GPI will design piping and utility connections associated with this item. 5. Seating Area Pavilion It is anticipated that this will be a pre-manufactured item chosen by the Township. This item will require representation on the plans and construction details, and in the technical specifications. Additional construction administration will also be required in the form of shop drawings, inspections, and payment coordination. The work performed by GPI will include foundation design for the pavilion. The structural/architectural design is to be performed by a professional engineer, licensed in the State of New Jersey, under the responsibilities of the pavilion vendor. 6. Playground It is anticipated that the playground equipment will be pre-manufactured items chosen by the Township. This task will require representation on the plans and construction details, and in the technical specifications. Additional construction administration will also be required in the form of shop drawings, inspections, and payment coordination. The work performed by GPI specifically excludes the structural design of the playground equipment. The structural/footing design is to be performed by a professional engineer, licensed in the State of New Jersey, under the responsibilities of the playground equipment vendor. Page | 5
File revisions (1)
- Sep 29, 2026
2e96ec8240f711,827,543 bytes