Packet · Nov 25, 2024
Township Council Meeting — Packet
2e96ec8240f722ba48013393d4787a1405d283f925366b0f0b8e5ce974c17182Indexed text · page 90
Show all pagesZayibeth Carballo-Township Engineer Township of West Orange October 25, 2024 OSPAC/Crystal Lake ALTERNATES FEE SCHEDULE Fishing Pier & Floating Dock Paddle Boat / Kayak Launch Area Pre-Fabricated Pedestrian Footbridge Shoreline and Outdoor Showers Seating Area Pavilion Playground Food Truck Area $10,700.00 $10,700.00 $11,400.00 $9,600.00 $9,600.00 $7,800.00 $7,200.00 HOURLY BILLING RATES As submitted in our Qualification package to the Township of West Orange on November 28, 2023, following are our municipal billing rates for 2024: PROFESSIONAL ENGINEER $ 180.00 SENIOR PROJECT MANAGER, ENGINEERING $ 160.00 SENIOR PROJECT MANAGER, LANDSCAPE ARCHITECTURE $ 150.00 SENIOR DESIGNER $ 125.00 DESIGNER $ 95.00 INSPECTOR $ 105.00 ENGINEERING TECHNICIAN $ 85.00 PROFESSIONAL LAND SURVEYOR $ 170.00 SENIOR PROJECT MANAGER, SURVEYING $ 150.00 PROJECT SURVEYOR $ 135.00 SURVEYING TECHNICIAN $ 105.00 PARTY CHIEF $ 110.00 INSTRUMENT PERSON $ 95.00 ADMINISTRATIVE SUPPORT $ 75.00 Rates Subject to Change Annually Page | 7
File revisions (1)
- Sep 29, 2026
2e96ec8240f711,827,543 bytes