ginning and end of project limit, and at least two in the construction limits. Vertical control will be based on NAVD 1988. Detailed descriptions of the elevation benchmarks shall be shown on the Plan Sheets. Section I | Page 2

Page 119

2024 CDBG Road Rehabilitation II. ▪ Location of all topographic features within the existing right-of-way and fifty (50) feet up any intersecting streets. These features will include buildings, curbs, sidewalks, driveways, depressed curbs, driveway aprons, sidewalk depressed curbs, steps, walls, pillars, fences, guide rail, trees greater than 4” diameter within the right-of-way (with diameters), shrubs, flag poles, lamp posts, sign posts, mailboxes, drainage swales and traffic signals and related equipment enclosures. ▪ Locate all utilities by above ground observation and utility mark-outs. The horizontal locations and elevations of the sanitary sewer storm drainage features will be measured. The pipe material, invert elevations and pipe diameters will be measured only as needed for drainage improvements. ▪ Property lines and right-of-way will be depicted based on the municipal tax map and County GIS information. B. Topographic base mapping of the project area will be prepared at a horizontal scale of 1"=20', using AutoCAD format. The plans will show the Tax Map right-of-way and all information located on the survey. Centerline profile will be provided at a horizontal scale of 1" = 20' and vertical scale of 1" = 2'. Cross-sections will be provided at a horizontal scale of 1" = 5' and vertical scale of 1"= 2'. C. Base map plans will be provided to the Township on printed sheets and digitally, in the format requested by the Township. D. All surveying and design information will be provided in standard engineering units (feet/10ths/100ths) or (feet/inches). Civil Engineering Services A. Before commencing the design, we will meet with you to review the specific requirements, including reviewing each street in the field. We will coordinate our efforts with your department throughout the project. B. We will prepare engineering plans for each street at an anticipated scale of 1” = 20’ utilizing the base mapping prepared above. C. Proposed roadway profiles will match existing grades. D. Curb ramp design will detail the construction of ADA compliant curb ramps utilizing NJDOT curb ramp standards and details. Curb will be granite 6” face, concrete curbs at ADA ramps. E. Design new granite curb for areas where required on all roads, milling of existing pavement and construction of new 2” surface course with full depth asphalt pavement where

Page 119

te curbs at ADA ramps. E. Design new granite curb for areas where required on all roads, milling of existing pavement and construction of new 2” surface course with full depth asphalt pavement where required, replacement sidewalk and driveway aprons as required, new striping and new traffic signage and shade trees as directed by the Township. F. We assume design of minor drainage improvements as necessary. Should substantial drainage upgrades be required, this proposal will be amended. G. New manhole castings as necessary, repair manholes as required and new catch basin frames, grates, curb piece, rebuild inlets as required. H. We will coordinate with West Orange Traffic Bureau and will prepare detour plans each roadway closure, as needed. Detour plans will depict detour routes with signage on to local and or County roadways as required for the roadway milling and resurfacing operations. Section I | Page 3

Page 120

2024 CDBG Road Rehabilitation I. All design criteria will comply with the current NJDOT and MUTCD specifications. J. We will prepare a complete set of specifications. K. A final Engineer’s Estimate of Construction will also be prepared. L. All plans and specifications will be in accordance with New Jersey Department of Transportation Standard Specifications, and we will submit them for review by the NJDOT Local Aid Office. M. We will prepare and submit twenty (20) sets of Contract Documents. ASSUMPTIONS 1. Roadway improvements will be included at the intersection with Chestnut Street. 2. Curb ramps to be reconstructed as required. 3. Improvements at the intersection of Franklin and Main are excluded from this proposal. 4. No modification or upgrades in county or NJDOT right-of-way or jurisdiction. 5. Excludes modification or upgrades to bridges/approaches or traffic signal equipment. Section I | Page 4

Page 121

2024 CDBG Road Rehabilitation Section II: Fee Schedule Surveying & Design Our fee for the tasks outlined above is: Franklin Avenue, from Main Street to Chestnut Street and Oxford Place, from Cherry Street to Chestnut Street Survey $8,820.00 Design $17,788.00 Total Fee $26,608.00 FEE SCHEDULE – Construction Inspection & Certification of Completion The time required to perform construction inspection services is a function of established contract duration(s), contractor’s schedule, and the Township’s need for part-time or full-time inspection. We will provide construction inspection services to fit with the Township’s needs. The services will be provided on an hourly basis. Our fee for the above referenced services is as follows: Construction Administration/Construction Inspection Services Construction Inspection Overtime Rate $105.00/hr. $157.50/hr. HOURLY BILLING RATES As submitted in our Qualification package to the Township of West Orange on November 28, 2023, the following are our municipal billing rates for 2024: PROFESSIONAL ENGINEER SENIOR PROJECT MANAGER, ENGINEERING SENIOR PROJECT MANAGER, LANDSCAPE ARCHITECTURE SENIOR DESIGNER DESIGNER INSPECTOR INSPECTOR OVERTIME RATE ENGINEERING TECHNICIAN $ $ $ $ $ $ $ $ 180.00 160.00 150.00 125.00 95.00 105.00 157.50 85.00 PROFESSIONAL LAND SURVEYOR SENIOR PROJECT MANAGER, SURVEYING PROJECT SURVEYOR SURVEYING TECHNICIAN PARTY CHIEF INSTRUMENT PERSON ADMINISTRATIVE SUPPORT $ $ $ $ $ $ $ 170.00 150.00 135.00 105.00 110.00 95.00 75.00 Section II | Page 5

Page 122

2024 CDBG Road Rehabilitation Section III: Personnel Assignments For this project, GPI will perform the work in its entirety. No sub-consultants will be needed. All work will be done entirely within GPI’s Engineering and Surveying Departments. Michael E. Pirog, PE, CME Project Manager, will be responsible for the overall design, contract adherence, and overall project supervision. Mr. Pirog is quite familiar with the Township of West Orange, having worked on several other Township projects in recent years. He will be assisted by Engineering Department staff members Michael A. Wallo, PE, CME, Assistant Director of Engineering/Project Engineer and Ryan Mangano, Senior Designer. Quality Assurance-Quality Control (QAQC) will be performed by Andrew Cangiano, PE, CME, Director of Engineering – Morris Plains Office. Section III | Page 6

Page 123

2024 CDBG Road Rehabilitation Section IV: Project Schedule GPI is committed to adhering to the Township’s goal of advertising for bids by Summer 2025 and starting construction in Fall/Winter 2025. We anticipate work will proceed within one (1) week after the contract is awarded. We have the resources to complete the project promptly, and we are confident that we can achieve the Township’s goal. 1 Surveying Services 2 Design of Preliminary Plans/Specs 3 Township Review and Comment 4 Final Plans and Specifications for NJDOT 5 NJDOT Review 6 Final Bid Documents July 2025 June 2025 May 2025 April 2025 March 2025 February 2025 January 2025 December 2024 December 16, 2024 (Assumed Award & NTP ) We have assumed a December 16, 2024 contract award, and have prepared the following Project Schedule. Section IV | Page 7

Page 124

2024 CDBG Road Rehabilitation Section V: Sample Insurance Certificate Section V | Page 8

Page 125

architects + engineers 119 Cherry Hill Road, Ste 110 Parsippany. NJ 07054 | tei 862 207 5900 ENGINEERING NJ #24GA28019100 November 27, 2024 VIA EMAIL Zayibeth Carballo, P.E. Assist. Municipal Engineer Township of West Orange 25 Lakeside Avenue West Orange, NJ 07052 Re: Proposal for Professional Engineering Services 2024 CDBG Road Rehabilitation of Franklin Avenue (from Main Street to Chestnut Street) and Oxford Place (from Cherry Street to Chestnut Street) West Orange, NJ H2M Proposal. No.: LP241375 Dear Ms. Carballo: As you requested, H2M is pleased to presefit this Proposal to the Township of West Orange for providing Professional Engineering Services for design for the Road Rehabilitation of Franklin Avenue (from Main Street to Chestnut Street) and Oxford Place (from Cherry Street to Chestnut Street). The following outlines our Project Understanding, Scope of Services, and Engineering Fee and Billing Method. Project Understanding The RFP identifies a section of Valley Road scheduled for improvement for a total length of 2,000 feet of roadway. The improvements include a combination of milling and resurfacing, pavement striping, curbs and sidewalk repairs, aprons, driveway repair, new ADA-compliant curb ramps, and restoration of manholes and catch basins and replacement of their castings at several locations as generally outlined in the RFP. The extent and type of improvements will be made after a walkthrough inspection with the Township Engineer that will take place after the award of the Contract for Engineering Services. The proposed improvements do not include road widening, changes in vertical or horizontal alignment, changes to existing underground utilities, changes to existing guide rails, or construction of new sidewalks. As on other projects, the Township's construction inspector will determine the exact layout of the ADA-compliant curb ramps during construction. Estimated quantities will be included in the bid items for the curb ramps and standard New Jersey Department of Transportation (NJDOT) curb ramp details will be included in the drawings. All construction will take place within existing rights-of-way. Therefore, boundary surveys or preparation of easements/right-of-way widening are not needed and are not included in the scope of services. A topographic survey (described below) will be used to show the extent of improvements and

Page 125

preparation of easements/right-of-way widening are not needed and are not included in the scope of services. A topographic survey (described below) will be used to show the extent of improvements and the estimated quantities associated with the improvements on each drawing. In addition, we will add house numbers found on Township Tax Maps to the drawings for the Township and Contractor's use during the construction phase of the project. As noted in the RFP, the project is being funded by the Community Development Block (CDBG) program of the U.S. Department of Housing and Urban Development and administered by the Essex County Division of Housing and Community Development. As such, the bid documents will include the latest H2M Architects, Engineers, Land Surveying and Landscape Architecture, DPC (NY) offers its services in NY only H2M Architects & Engineers, Inc. (NJ) offers its services in NJ, DE, CT, FL, LA, MA, PA, VA only H2M Associates, Inc. (NJ) offers its engineering, land surveying, landscape architecture services in NJ only hzm.com