Packet · Dec 10, 2024
Township Council Meeting — Packet
7103bae55cfad555ffbc71f79fc94d646acd5e97bb0ad314f610ac4825e4d443Indexed text · page 120
Show all pages2024 CDBG Road Rehabilitation I. All design criteria will comply with the current NJDOT and MUTCD specifications. J. We will prepare a complete set of specifications. K. A final Engineer’s Estimate of Construction will also be prepared. L. All plans and specifications will be in accordance with New Jersey Department of Transportation Standard Specifications, and we will submit them for review by the NJDOT Local Aid Office. M. We will prepare and submit twenty (20) sets of Contract Documents. ASSUMPTIONS 1. Roadway improvements will be included at the intersection with Chestnut Street. 2. Curb ramps to be reconstructed as required. 3. Improvements at the intersection of Franklin and Main are excluded from this proposal. 4. No modification or upgrades in county or NJDOT right-of-way or jurisdiction. 5. Excludes modification or upgrades to bridges/approaches or traffic signal equipment. Section I | Page 4
File revisions (1)
- Sep 29, 2026
7103bae55cfa30,423,597 bytes