Packet · Dec 10, 2024
Township Council Meeting — Packet
7103bae55cfad555ffbc71f79fc94d646acd5e97bb0ad314f610ac4825e4d443Indexed text · page 155
Show all pagesMA 2025 NJDOT Aid Program J. We will prepare a complete set of specifications. K. A final Engineer’s Estimate of Construction will also be prepared. L. All plans and specifications will be in accordance with New Jersey Department of Transportation Standard Specifications, and we will submit them for review by the NJDOT Local Aid Office. M. We will prepare and submit twenty (20) sets of Contract Documents. ASSUMPTIONS 1. Full project length will be mill and overlay. No change to existing profile or cross-slopes. 2. Partial or full curb and sidewalk replacement assumed for all roads. 3. Proposed sidewalk where there is no existing sidewalk is excluded from this proposal. 4. ADA curb ramp reconstruction as required. 5. Drainage improvements as required. 6. GPI assumes all railing, guide rails, steps, retaining wall or landscape walls will remain as-is. Replacement of these features is not anticipated and is excluded from this proposal. Section I | Page 4
File revisions (1)
- Sep 29, 2026
7103bae55cfa30,423,597 bytes